MUHAMAD, WAKHYU TRISURYA (2018) PENANGANAN KETERLAMBATAN PROSES BONGKAR MUATAN LIQUEFIED PETROLEUM GAS (LPG) SECARA SHIP TO SHIP DI KAPAL VLGC PERTAMINA GAS 1. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text
35. STS CHECKLIST 6.PDF Download (4MB) | Preview |
|
|
Text
35. STS CHECKLIST 7.PDF Download (4MB) | Preview |
|
|
Text
36. FLOW REPORT.1.PDF Download (4MB) | Preview |
|
|
Text
36. FLOW REPORT.3.PDF Download (4MB) | Preview |
|
|
Text
36. FLOW REPORT.2.PDF Download (4MB) | Preview |
|
|
Text
37. SOUNDING REPORT 2.PDF Download (4MB) | Preview |
|
|
Text
37. SOUNDING REPORT 1.PDF Download (4MB) | Preview |
|
|
Text
37. SOUNDING REPORT 3.PDF Download (4MB) | Preview |
|
|
Text (DAFTAR RIWAYAT HIDUP)
38. DAFTAR RIWAYAT HIDUP.PDF Download (4MB) | Preview |
|
|
Text
38.TIME SHEET..PDF Download (4MB) | Preview |
|
|
Text
1. COVER DEPAN.PDF Download (4MB) | Preview |
|
|
Text
1. HALAMAN JUDUL.PDF Download (4MB) | Preview |
|
|
Text
2. HALAMAN PERSETUJUAN.PDF Download (4MB) | Preview |
|
|
Text
3. HALAMAN PENGESAHAN.PDF Download (4MB) | Preview |
|
|
Text
4. HALAMAN PERNYATAAN.PDF Download (4MB) | Preview |
|
|
Text (JUDUL)
5. HALAMAN MOTTO.PDF Download (4MB) | Preview |
|
Text (KATA PENGANTAR)
7. KATA PENGANTAR.PDF Download (4MB) |
||
|
Text (DAFTAR ISI)
8. DAFTAR ISI.PDF Download (4MB) | Preview |
|
|
Text
6. HALAMAN PERSEMBAHAN.PDF Download (4MB) | Preview |
|
|
Text
9. DAFTAR TABEL.PDF Download (4MB) | Preview |
|
|
Text
10. DAFTAR GAMBAR.PDF Download (4MB) | Preview |
|
|
Text
11. DAFTAR LAMPIRAN.PDF Download (4MB) | Preview |
|
|
Text (ABSTRAK)
12. ABSTRAKSI INDO.PDF Download (4MB) | Preview |
|
|
Text (ABSTRACT)
13. ABSTRACT ENGLISH.PDF Download (4MB) | Preview |
|
|
Text (BAB 1)
14. BAB 1 FIX.PDF Download (4MB) | Preview |
|
|
Text
15. BAB 2 FIX.PDF Download (5MB) | Preview |
|
Text (BAB 3)
16. BAB 3 FIX.PDF Restricted to Registered users only Download (4MB) | Request a copy |
||
|
Text (BAB 5)
18. BAB 5 FIX.PDF Download (4MB) | Preview |
|
Text (BAB 4)
17. BAB 4 FIX.PDF Restricted to Registered users only Download (4MB) | Request a copy |
||
|
Text
19. DAFTAR PUSTAKA.PDF Download (4MB) | Preview |
|
|
Text
22. CREWLIST PG 1 UPDTAE.PDF Download (4MB) | Preview |
|
|
Text
23. SHIP PARTICULAR PERTAMINA GAS 1.PDF Download (4MB) | Preview |
|
|
Text
24. KUESIONER -KAPTEN.PDF Download (4MB) | Preview |
|
|
Text
25. FOTO KAPAL 1.PDF Download (4MB) | Preview |
|
Text
26. FOTO CARGO HOSE 2.PDF Download (4MB) |
||
|
Text
27. FOTO CCR 3.PDF Download (4MB) | Preview |
|
|
Text
28. FOTO CREW 4.PDF Download (4MB) | Preview |
|
|
Text
29. NOTICE OF READINESS.PDF Download (4MB) | Preview |
|
|
Text
30. DISCHARGE AGREEMENT.XLS.PDF Download (4MB) | Preview |
|
|
Text
31. DOS.PDF Download (4MB) | Preview |
|
|
Text
32. CONTINGENCY PLAN.PDF Download (4MB) | Preview |
|
|
Text
33. PERSONAL BASKET.PDF Download (4MB) | Preview |
|
|
Text
34. SHIP SHORE SAFETY CHECKLIST.PDF Download (200kB) | Preview |
|
|
Text
35. STS CHECKLIST 3.PDF Download (4MB) | Preview |
|
|
Text
35. STS CHECKLIST 2.PDF Download (4MB) | Preview |
|
|
Text
35. STS CHECKLIST 4.PDF Download (4MB) | Preview |
|
|
Text
35. STS CHECKLIST 5.PDF Download (4MB) | Preview |
|
|
Text
35. STS CHECKLIST 1.PDF Download (4MB) | Preview |
Abstract
Trisurya, M.W, 2017. NIT: 50134789 N, “Penanganan Keterlambatan Proses Bongkar Muatan Liquefied Petroleum Gas (LPG) Secara Ship To Ship di Kapal VLGC Pertamina Gas 1”. Nautical Study Program, Diploma IV Program, Merchant Marine Polytechnic of Semarang, 1st Advisor: Capt. Arika Palapa., M.Si., M.Mar. and 2nd Advisor: Tony Santiko S.St., M.Si. VLGC vessel Pertamina Gas 1 is a fully refrigerated type gas vessel designed to transport LPG in large quantities. LPG consists of butane and propane which is a gas charge in liquid form. The process of discharge of LPG cargo on VLGC vessel Pertamina Gas 1 is carried out by ship to ship operation where VLGC vessel Pertamina Gas 1 as mother ship. Based on the results of research from the author, the process of loading and unloading on the VLGC vessel Pertamina Gas 1 experienced delays due to some constraints both from internal factors and external factors. The purpose of the authors to do this research is to find out why there is a delay when the process of loading and unloading and how the effort to handle the delay. In this thesis the author uses the rules derived from the theory related to the topic discussed. The research method used by the authors in the delivery of the problem is SWOT analysis supported by the fishbone diagram, Internal Strategic Factos Analysis Summary (IFAS) and ExternalStrategic Factors Analysis Summary (EFAS). At the time of loading and unloading activities on a ship to ship basis, there is often an inability to cause delay in loading and unloading process, such as lack of Deck Rating knowledge about process of loading and unloading process, Gas Engineer and Gas Man condition is less fit due to dense schedule of demolition and lack of good coordination between related parties. From the inability to make efforts to optimize the process of loading and unloading so that there is no delay in dismantling. These efforts are to increase the knowledge of Deck Rating by conducting training and guidance on loading and unloading procedures, duties and responsibilities of each crew, adequate rest for Gas Engineer and Gas Man and every ship crew should be independent and not dependent on Gas Engineer and Gas Man as well as improved coordination among stakeholders. Key words : LPG, discharging, VLGC.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | LPG, discharging, VLGC. |
Subjects: | Skripsi Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 01 Feb 2019 01:48 |
Last Modified: | 01 Feb 2019 01:48 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/719 |
Actions (login required)
View Item |