ZAMRONI, ZAMRONI (2017) OPTIMALISASI JUMLAH ARMADA TRUCK PADA KEGIATAN BONGKAR COIL DI KAPAL MV. MIGHTY BOSS GUNA MEMINIMALISIR BIAYA OPERASIONAL DI PELABUHAN CIGADING MERAK BANTEN. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text
15-TRANSKRIP WAWANCARA odinn.pdf Download (586kB) | Preview |
|
|
Text
16- DAFTAR RIWAYAT HIDUP odin.pdf Download (580kB) | Preview |
|
|
Text
DAILY REPORT lampiran.pdf Download (640kB) | Preview |
|
|
Text
FORKLIFT.pdf Download (567kB) | Preview |
|
|
Text
DAMAGE LAMPIRAN.pdf Download (468kB) | Preview |
|
|
Text
Halaman Persetujuan.pdf Download (9MB) | Preview |
|
|
Text
lampiran waktu.pdf Download (995kB) | Preview |
|
|
Text
DAMAGE CARGO LIST.pdf Download (674kB) | Preview |
|
|
Text
TS-DR.pdf Download (761kB) | Preview |
|
|
Text
SOF.pdf Download (8MB) | Preview |
|
|
Text
SURAT EDARAN DIREKTUR JENDERAL PAJAK.pdf Download (538kB) | Preview |
|
|
Text
3. Halaman Pengesahan.pdf Download (647kB) | Preview |
|
|
Text
1.Halaman Judul.pdf Download (1MB) | Preview |
|
|
Text
4. Halaman Pernyataan.pdf Download (652kB) | Preview |
|
|
Text
SOF LAMPIRAN.pdf Download (474kB) | Preview |
|
|
Text
5. Halaman Motto.pdf Download (482kB) | Preview |
|
|
Text
6. Halaman Persembahan.pdf Download (450kB) | Preview |
|
|
Text
7. Kata Pengantar udin.pdf Download (586kB) | Preview |
|
|
Text
8. Abstraksi UDIN.pdf Download (503kB) | Preview |
|
|
Text
9. BAB I UDIN ACC.pdf Download (663kB) | Preview |
|
Text
11. BAB 3 UDIN ACC.pdf Restricted to Registered users only Download (552kB) | Request a copy |
||
|
Text
10. BAB II UDIN ACC.pdf Download (982kB) | Preview |
|
Text
12. BAB 4 ODIN.pdf Restricted to Registered users only Download (708kB) | Request a copy |
||
|
Text
13.BAB V. PENUTUP.pdf Download (623kB) | Preview |
|
|
Text
14. Kertas Pembatas.pdf Download (38kB) | Preview |
Abstract
Zamroni, 50135106 K, 2017, "Optimizing the Number of Truck Fleets in Coil Discharge Activities on MV Mighty Boss Ships. To Maximize Operational Cost in Port of CigadingMerakBanteen ", Diploma Program IV,mini thesis ofPort and Shipping Departement,Merchant Marine PolytechnicSemarang, Advisor (I): NurRohmah, S.E., M.M, Advisor (II): Capt. DidiSumadi. The suitability of the number of fleets and rotation of trucks in the coil discharge activities is very influential on the operational costs of a company. However, the implementation of trucking service on the coil discharge activities in the MV. Mighty Boss has not run optimally and need improvement, therefore it is necessary to analyze in optimizing the number of truck fleets in the coil dischage activities in MV vessel. Mighty Boss to minimize operational cost at CigadingMerak port of Banten. The purpose of this research is to know the process of rotation of truck on coil dischargeactivity in MV. Mighty Boss ship in order to minimize operational cost in Port of CigadingMerakBanten, to know the constraint that happened at rotation of truck fleet on coil discharge activity inMV. Mighty Boss ship to minimize operational cost at Port of CigadingMerakBanten, and to know the effort made to optimize the truck fleet coil discharge activity inMV. Mighty Boss ship to minimize operational cost in Port of CigadingMerakBanten. This research uses descriptive qualitative method by describing the truck rotation process on the implementation of coil discharge activity inMV. Mighty Boss ship. Besides, data collection is done by interview, observation, book literature and documentation in the form of photos of coil discharge activity inMV. Mighty Boss ship to minimize the company's operational costs. The result of this research shows the process of rotation of truck on coil discharge activity inMV. Mighty Boss ship begins with the reduction of coil that is done by using cranes and webbing rubber-coated sling to avoid damage at the time of disassembly, coil lift to chasis and delivery of coil using truck to warehouse PT. Latinusa. Constraints that occur in the rotation of the truck when coil discharging on the MV. Mighty Boss ship to minimize operational cost in Port of Cigading is human resource (SDM), equipment and nature. Efforts are made to overcome obstacles in the process of truck rotation on the coil discharge activity inMV. Mighty Boss shipto minimize operational cost at Port of CigadingMerakBanten is to do the calculation and coordination before and during activity, to calculate to the amount of crane productivity, pay attention to terrain or geographical condition. Keywords: Optimization, Fleet Truck, Coil Discharg
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | Skripsi Skripsi > TALK |
Divisions: | TALK |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 25 Jan 2019 08:06 |
Last Modified: | 06 Feb 2019 01:01 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/246 |
Actions (login required)
View Item |