WAWANSYAH, WAWANSYAH (2018) ANALISIS PERAWATAN ALAT BONGKAR MUAT UNTUK MENANGGULANGI KETERLAMBATAN PEMUATAN DI MV. KEOYANG MAJEST. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text (LAMPIRAN)
LAMPIRAN.PDF Download (9MB) | Preview |
|
|
Text (ABSTRAK INDO-ING)
abstrak indo-ing.PDF Download (9MB) | Preview |
|
|
Text (BAB I)
bab I.PDF Download (9MB) | Preview |
|
|
Text (BAB II)
bab II.PDF Download (9MB) | Preview |
|
Text (BAB III)
BAB III.PDF Restricted to Registered users only Download (9MB) | Request a copy |
||
|
Text (HALAMAN DEPAN)
halaman depan.PDF Download (10MB) | Preview |
|
|
Text (BAB V)
BAB V.PDF Download (9MB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.PDF Download (9MB) | Preview |
|
Text (BAB IV)
BAB IV.PDF Restricted to Registered users only Download (9MB) | Request a copy |
Abstract
Wawansyah, NIT: 50134828.N, 2018, “Maintenance Analysis of Loading and Unloading Tools To Tackle Delayad Loading On MV. Keoyang Majesty”, Diploma IV Program, thesis of Nautika Study Program, Semarang Merchant Marine Polytechnic, Advisors I: Sahabuddin Sunusi, Advisors II: Achmad Wahyudiono In order to transport goods from port to port to unloading ports can be timely in accordance with a predetermined schedule, then in performing maintenance of loading and unloading equipment is one important factor for the loading process to run smoothly. Based on these facts the authors are interested to create a thesis with the title "Maintenance Analysis of Loading and Unloading Tools to Tackle Delayed Loading On MV. Keoyang Majesty". In implementing the maintenance of loading and unloading equipment there are several problems encountered, namely: the implementation of maintenance management and repair of loading and unloading equipment on the ship MV. Keoyang Majesty, how the standard operating procedure, whether there are differences and constraints of both, and what efforts are made to overcome them. If in such a difference becomes a problem then the need for evaluation should be followed up. And if there is an obstacle or constraint then we have to find a solution to overcome the problem. In this thesis research method used is the method of ultrasound (Urgency, Seriousness, and Growth) which is observative by observing the existing activities and methods of interviewing is conducting interviews directly to the crew on the loading and unloading equipment as well as its maintenance. Based on the analysis that has been done, that maintenance and repair of loading and unloading equipment on the ship MV. Keoyang Majesty implement preventive maintenance and maintenance breakdown. While the standard operating procedure implementation such as manual instruction book is periodic maintenance. the obstacles experienced in this implementation are the insecurities that still occur. So researchers try to make efforts in overcoming these obstacles and make some efforts related to maintenance and repair of loading and unloading tools. From the results of the analysis can be concluded that maintenance and repair of loading and unloading equipment needs to be planned. The planned care method is carried out properly and regularly according to the programmed schedule, in order to delay loading or unloading and the damage to loading and unloading equipment can be avoided so that loading and unloading equipment is always ready for use. Keywords: Breakdown Maintenance, Preventive Maintenance, Loading And Unloading Equipment, Ultrasound.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Breakdown Maintenance, Preventive Maintenance, Loading And Unloading Equipment, Ultrasound. |
Subjects: | Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 01 Feb 2019 02:51 |
Last Modified: | 06 Feb 2019 03:25 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/733 |
Actions (login required)
View Item |