ILHAM, ARDIANSYAH PANGESTU (2018) PENGARUH SISTEM PENDINGIN TERHADAP KERJA MESIN DIESEL GENERATOR DIKAPAL MV. ARMADA SERASI. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text
18. DAFTAR PUSTAKA.PDF Download (4MB) | Preview |
|
|
Text
19. LAMPIRAN 2 (CREW LIST).PDF Download (4MB) | Preview |
|
|
Text
19. LAMPIRAN 1 (SHIP PARTICULAR).PDF Download (4MB) | Preview |
|
|
Text
19. LAMPIRAN 3 (WAWANCARA).PDF Download (4MB) | Preview |
|
|
Text
01. HALAMAN JUDUL.PDF Download (4MB) | Preview |
|
|
Text
02. HALAMAN PERSETUJUAN.PDF Download (6MB) | Preview |
|
|
Text
03. HALAMAN PENGESAHAN.PDF Download (6MB) | Preview |
|
|
Text
04. HALAMAN PERNYATAAN.PDF Download (5MB) | Preview |
|
|
Text
05.MOTTO OKE.PDF Download (4MB) | Preview |
|
|
Text
06.HALAMAN PERSEMBAHAN.PDF Download (4MB) | Preview |
|
|
Text
07. KATA PENGANTAR.PDF Download (4MB) | Preview |
|
|
Text
10. DAFTAR TABEL.PDF Download (4MB) | Preview |
|
|
Text
08.DAFTAR ISI OKE.PDF Download (4MB) | Preview |
|
|
Text
09. DAFTAR GAMBAR.PDF Download (4MB) | Preview |
|
|
Text
11. ABSTRAKSI OKE.PDF Download (4MB) | Preview |
|
|
Text
12. ABSTRACT OKE.PDF Download (4MB) | Preview |
|
|
Text
14. BAB II OK.PDF Download (4MB) | Preview |
|
Text
15. BAB III OK.PDF Restricted to Registered users only Download (4MB) | Request a copy |
||
|
Text
13. BAB I OK.PDF Download (4MB) | Preview |
|
Text
16. BAB IV OK.PDF Restricted to Registered users only Download (4MB) | Request a copy |
||
|
Text
17. BAB V OK.PDF Download (4MB) | Preview |
Abstract
Ilham Ardiansyah Pangestu, NIT : 50134939.T, 2018, “The Effect Of Cooling System On Diesel Engine Work At MV. Armada Serasi”, minithesis of Technical Program, Diploma IV Program, Merchant Marine Polythecnic Semarang, Supervising professor I: H. Sumarno P.S., M.M M.Mar. E and Supervising professor II: Capt. H. S. SUMARDI, SH, M.M., M.Mar. Cooling system on diesel engine have a important function on operational for keep the temperature stable. On MV. Armada Serasi have three generator and can be operated only two generator that is the generator number two and generator number three On the running condition sometime we found some trouble like as which happened at the cooling pump diesel motor at the generator number one side that is the pump was not produce maximal pressure, not consist the normal pressure for cooling process diesel motor at generator. The method used in this research with using SWOT. Data collection techniques are done through observation, documentation and literature study directly on subjects related with cooling system. In this research obtained from this study that the decrease of the working pressure of generator cooler freshwater pump is due to leakage of pipe connection from the thermostat to the pump suction, there is crust at the impeller and rupture of mechanical seals and leeway on the part shaft bearing. To overcome the above problems in order to perform at the pump to be optimal need to be repaired and treatment with standart operatonal procedure. Keywords : Cooling system, generator, pump.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Cooling system, generator, pump. |
Subjects: | Skripsi > Teknika |
Divisions: | Teknika |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 29 Jan 2019 08:32 |
Last Modified: | 06 Feb 2019 02:28 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/505 |
Actions (login required)
View Item |