OPTIMALISASI PROSES PENAMBATAN MT.PEGADEN DI SBM (SINGLE BUOY MOORING) BALONGAN

ANINDYA, RAHMATIKA AZMI (2017) OPTIMALISASI PROSES PENAMBATAN MT.PEGADEN DI SBM (SINGLE BUOY MOORING) BALONGAN. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img] Text (BAB IV)
FIX BAB IV.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text (BAB III)
FIX BAB III.pdf
Restricted to Registered users only

Download (898kB) | Request a copy
[img]
Preview
Text (BAB V)
FIX BAB V.pdf

Download (498kB) | Preview
[img]
Preview
Text (COVER)
FIX COVER.pdf

Download (10MB) | Preview
[img]
Preview
Text (DAFTAR ISI)
FIX DAFTAR ISI.pdf

Download (601kB) | Preview
[img]
Preview
Text (DAFTAR LAMPIRAN)
FIX DAFTAR LAMPIRAN.pdf

Download (572kB) | Preview
[img]
Preview
Text (GAMBAR)
FIX GAMBAR.pdf

Download (971kB) | Preview
[img]
Preview
Text (KATA PENGANTAR)
FIX KATA PENGANTAR.pdf

Download (675kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
FIX DAPUS.pdf

Download (494kB) | Preview
[img]
Preview
Text (MOTTO)
FIX MOTO.pdf

Download (805kB) | Preview
[img]
Preview
Text (PERNYATAAN)
FIX PERNYATAAN.pdf

Download (592kB) | Preview
[img]
Preview
Text (PERSEMBAHAN)
FIX PERSEMBAHAN.pdf

Download (731kB) | Preview
[img]
Preview
Text (PERSETUJUAN)
FIX PERSETUJUAN.pdf

Download (494kB) | Preview
[img]
Preview
Text (COVER)
FIX COVER.pdf

Download (100kB) | Preview
[img]
Preview
Text (ABSTRAK)
FIX ABSTRAK DAN ABSTRACT.pdf

Download (604kB) | Preview
[img]
Preview
Text (BAB 1)
FIX BAB I.pdf

Download (702kB) | Preview
[img]
Preview
Text (BAB II)
FIX BAB II.pdf

Download (715kB) | Preview
Official URL: http://www.library.pip-semarang.ac.id

Abstract

The berthing process of a vessel depends on many factors, such as vessel engine, winch power, weather and must pay attention for setting tross rope to make sure that vessel can berth in good condition, because problems can cause damage for vessel and environment. The things to be concerned so that berthing process can progress optimally is by avoiding and minimizing factors that caused berthing process cannot be optimal. Based on the author’s experience during sea project on the MT.Pegaden, there are a lot of problems that happen during berthing process in Single Buoy Mooring Balongan, so the author was interested in observing and analyzing factors that caused berthing process cannot be optimal using two methods, there are fishbone analysis to map the problems and Strength, Weakness, Opportunity, Threat (SWOT) method as a problem solving strategies. The use of fishbone analysis is to map the cause factors of berthing process not to be optimal, it is divided into 6 parts there are machine, method, material, man, milieu and measure. After divided into 6 part based on the cause from internal factor and external factor used IFAS and EFAS, it is followed by implementation of Strength, Weakness, Opportunity, Threat (SWOT) method to combine the results in order to get the most effective strategy so that the berthing process can be optimal. Key word : Optimization, berthing, Single Buoy Mooring, Balongan

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Optimization, berthing, Single Buoy Mooring, Balongan
Subjects: Skripsi
Skripsi > Nautika
Divisions: Nautika
Depositing User: Mr Agus Wahyudi
Date Deposited: 21 Feb 2019 07:51
Last Modified: 21 Feb 2019 07:51
URI: http://repository.pip-semarang.ac.id/id/eprint/1538

Actions (login required)

View Item View Item