ANALISIS EFEKTIVITAS HOPPER TERHADAP KECEPATAN BONGKAR MUATAN CURAH DI PELABUHAN KHUSUS PT.SEMEN INDONESIA CABANG TUBAN

ACHMAD, ROYYAN (2018) ANALISIS EFEKTIVITAS HOPPER TERHADAP KECEPATAN BONGKAR MUATAN CURAH DI PELABUHAN KHUSUS PT.SEMEN INDONESIA CABANG TUBAN. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img]
Preview
Text (DAFTAR ISI)
09-Daftar-Isi.pdf

Download (186kB) | Preview
[img]
Preview
Text
10-Daftar-Gambar.pdf

Download (320kB) | Preview
[img]
Preview
Text (DAFTAR TABEL)
11-Daftar Tabel.pdf

Download (221kB) | Preview
[img]
Preview
Text (ABSTRAK)
12-ABSTRAK-royyan.pdf

Download (430kB) | Preview
[img]
Preview
Text (ABSTRACT)
13-ABSTRACT-royyan.pdf

Download (405kB) | Preview
[img]
Preview
Text (BAB 1)
14-BAB-I.pdf

Download (288kB) | Preview
[img]
Preview
Text (BAB 2)
15-BAB II - Copy.pdf

Download (269kB) | Preview
[img] Text (BAB 4)
17-BAB IV.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img]
Preview
Text (BAB 5)
18-BAB V.pdf

Download (241kB) | Preview
[img]
Preview
Text (TABEL)
20-tabel ci kuadrat.pdf

Download (228kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
19-Daftar Pustaka.pdf

Download (240kB) | Preview
[img]
Preview
Text (TRANSKIP WAWANCARA)
21-TRANSKRIP WAWANCARA.pdf

Download (239kB) | Preview
[img]
Preview
Text
22-MV. MANALAGI WANDA.pdf

Download (320kB) | Preview
[img] Text (BAB 3)
16-BAB III.pdf
Restricted to Registered users only

Download (403kB) | Request a copy
[img]
Preview
Text
24-Surat Ijin Keluar-Masuk Pelsus.pdf

Download (204kB) | Preview
[img]
Preview
Text (SURAT IJIN BONGKAR BATU BARA)
25-Surat Ijin bongkar batu bara (Foreman).pdf

Download (209kB) | Preview
[img]
Preview
Text (SURAT IJIN KELUAR MASUK PELSUS)
23-Surat Ijin Keluar-Masuk Pelsus.pdf

Download (204kB) | Preview
[img]
Preview
Text
26-Form Ijin lembur & check list TPPI.pdf

Download (254kB) | Preview
[img]
Preview
Text
28DAFTAR-RIWAYAT-HIDUP.pdf

Download (282kB) | Preview
[img]
Preview
Text (MV GOLDEN DESTINY)
27-MV. GOLDEN DESTINY (berita acara ).pdf

Download (239kB) | Preview
[img]
Preview
Text (JUDUL)
02-HALAMAN JUDUL-converted.pdf

Download (265kB) | Preview
[img]
Preview
Text (COVER DEPAN)
01 Cover Depan.pdf

Download (522kB) | Preview
[img]
Preview
Text (HALAMAN PERSETUJUAN)
03-halaman persetujuan ttd.pdf

Download (383kB) | Preview
[img]
Preview
Text (HALAMAN PENGESAHAN)
04 halaman pengesahan ttd.pdf

Download (385kB) | Preview
[img]
Preview
Text (HALAMAN PERNYATAAN)
05 halaman pernyataan ttd.pdf

Download (399kB) | Preview
[img]
Preview
Text (MOTTO)
06-MOTTO.pdf

Download (318kB) | Preview
[img] Text (HALAMAN PERSEMBAHAN)
07-HALAMAN-PERSEMBAHAN.pdf

Download (423kB)
[img]
Preview
Text (KATA PENGANTAR)
08-kata-pengantar.pdf

Download (368kB) | Preview
Official URL: htttp://www.library.pip-semarang.ac.id

Abstract

Achmad Royyan, NIT. 51145491.K, 2017 "Analysis of Hopper Effectiveness on the Speed of Bulk Loading at Special Ports of PT. Semen Indonesia Tuban Branch”, Program Diploma IV, Port and Shipping Department, Merchant Marine Polytechnic of Semarang, Supervisor I: : Ir. Fitri Kensiwi, M.Pd and Supervisor II: Capt. I Kadek Laju, SH, MM, M.MAR Hopper is one of the tools for loading and unloading on land which is used to unload bulk loads. With the increasingly crowded activities at the special port of PT Semen Indonesia at the Tuban branch, Hopper is expected to be able to improve the quality of increasingly crowded demolition activities. The purpose of this research is to find out the factors that influence Hopper in dismantling bulk cargo at a special port of PT. Semen Indonesia branch of Tuban, and to find out the effect caused by Hopper being ineffective in the demolition process at the special port of PT. Semen Indonesia at the tuban branch. In this thesis, the research method used is quantitative descriptive research method which regulates a research method using several aspects such as data collection through observation, literature study, interviews, documentation, and discussion related to the numbers. In this thesis data analysis techniques use Strengths, Weaknesses, Opportunities, Threats (SWOT), so data collection is added with a questionnaire.. From the results of the study can be known factors that cause ineffectiveness of Hopper in the dismantling process at a special port PT. Semen Indonesia tuban branch. Among them are weather factors, old Crane Hock Cycle time (HCT), and a valve opening system that is manual. Based on the results of the study, PT. Varia Usaha Bahari branch Tuban made an effort to check the weather before and during the event, replacing the manual Hopper valve opening system to become hydraulic. Enactment of ship feasibility deterrence, so that HCT from ship Cranes does not slow down Hopper performance. Thus PT. Varia Usaha Bahari can improve bulk cargo demolition services at the Special Port of PT. Semen Indonesia branch of Tuban. Keywords : Effectiveness, Hopper, Hock Cycle Time (HCT), Bulk Cargo.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Effectiveness, Hopper, Hock Cycle Time (HCT), Bulk Cargo.
Subjects: Skripsi
Skripsi > TALK
Divisions: TALK
Depositing User: Mr Agus Wahyudi
Date Deposited: 01 Feb 2019 08:27
Last Modified: 06 Feb 2019 03:38
URI: http://repository.pip-semarang.ac.id/id/eprint/763

Actions (login required)

View Item View Item