ACHMAD, ROYYAN (2018) ANALISIS EFEKTIVITAS HOPPER TERHADAP KECEPATAN BONGKAR MUATAN CURAH DI PELABUHAN KHUSUS PT.SEMEN INDONESIA CABANG TUBAN. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text (DAFTAR ISI)
09-Daftar-Isi.pdf Download (186kB) | Preview |
|
|
Text
10-Daftar-Gambar.pdf Download (320kB) | Preview |
|
|
Text (DAFTAR TABEL)
11-Daftar Tabel.pdf Download (221kB) | Preview |
|
|
Text (ABSTRAK)
12-ABSTRAK-royyan.pdf Download (430kB) | Preview |
|
|
Text (ABSTRACT)
13-ABSTRACT-royyan.pdf Download (405kB) | Preview |
|
|
Text (BAB 1)
14-BAB-I.pdf Download (288kB) | Preview |
|
|
Text (BAB 2)
15-BAB II - Copy.pdf Download (269kB) | Preview |
|
Text (BAB 4)
17-BAB IV.pdf Restricted to Registered users only Download (1MB) | Request a copy |
||
|
Text (BAB 5)
18-BAB V.pdf Download (241kB) | Preview |
|
|
Text (TABEL)
20-tabel ci kuadrat.pdf Download (228kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
19-Daftar Pustaka.pdf Download (240kB) | Preview |
|
|
Text (TRANSKIP WAWANCARA)
21-TRANSKRIP WAWANCARA.pdf Download (239kB) | Preview |
|
|
Text
22-MV. MANALAGI WANDA.pdf Download (320kB) | Preview |
|
Text (BAB 3)
16-BAB III.pdf Restricted to Registered users only Download (403kB) | Request a copy |
||
|
Text
24-Surat Ijin Keluar-Masuk Pelsus.pdf Download (204kB) | Preview |
|
|
Text (SURAT IJIN BONGKAR BATU BARA)
25-Surat Ijin bongkar batu bara (Foreman).pdf Download (209kB) | Preview |
|
|
Text (SURAT IJIN KELUAR MASUK PELSUS)
23-Surat Ijin Keluar-Masuk Pelsus.pdf Download (204kB) | Preview |
|
|
Text
26-Form Ijin lembur & check list TPPI.pdf Download (254kB) | Preview |
|
|
Text
28DAFTAR-RIWAYAT-HIDUP.pdf Download (282kB) | Preview |
|
|
Text (MV GOLDEN DESTINY)
27-MV. GOLDEN DESTINY (berita acara ).pdf Download (239kB) | Preview |
|
|
Text (JUDUL)
02-HALAMAN JUDUL-converted.pdf Download (265kB) | Preview |
|
|
Text (COVER DEPAN)
01 Cover Depan.pdf Download (522kB) | Preview |
|
|
Text (HALAMAN PERSETUJUAN)
03-halaman persetujuan ttd.pdf Download (383kB) | Preview |
|
|
Text (HALAMAN PENGESAHAN)
04 halaman pengesahan ttd.pdf Download (385kB) | Preview |
|
|
Text (HALAMAN PERNYATAAN)
05 halaman pernyataan ttd.pdf Download (399kB) | Preview |
|
|
Text (MOTTO)
06-MOTTO.pdf Download (318kB) | Preview |
|
Text (HALAMAN PERSEMBAHAN)
07-HALAMAN-PERSEMBAHAN.pdf Download (423kB) |
||
|
Text (KATA PENGANTAR)
08-kata-pengantar.pdf Download (368kB) | Preview |
Abstract
Achmad Royyan, NIT. 51145491.K, 2017 "Analysis of Hopper Effectiveness on the Speed of Bulk Loading at Special Ports of PT. Semen Indonesia Tuban Branch”, Program Diploma IV, Port and Shipping Department, Merchant Marine Polytechnic of Semarang, Supervisor I: : Ir. Fitri Kensiwi, M.Pd and Supervisor II: Capt. I Kadek Laju, SH, MM, M.MAR Hopper is one of the tools for loading and unloading on land which is used to unload bulk loads. With the increasingly crowded activities at the special port of PT Semen Indonesia at the Tuban branch, Hopper is expected to be able to improve the quality of increasingly crowded demolition activities. The purpose of this research is to find out the factors that influence Hopper in dismantling bulk cargo at a special port of PT. Semen Indonesia branch of Tuban, and to find out the effect caused by Hopper being ineffective in the demolition process at the special port of PT. Semen Indonesia at the tuban branch. In this thesis, the research method used is quantitative descriptive research method which regulates a research method using several aspects such as data collection through observation, literature study, interviews, documentation, and discussion related to the numbers. In this thesis data analysis techniques use Strengths, Weaknesses, Opportunities, Threats (SWOT), so data collection is added with a questionnaire.. From the results of the study can be known factors that cause ineffectiveness of Hopper in the dismantling process at a special port PT. Semen Indonesia tuban branch. Among them are weather factors, old Crane Hock Cycle time (HCT), and a valve opening system that is manual. Based on the results of the study, PT. Varia Usaha Bahari branch Tuban made an effort to check the weather before and during the event, replacing the manual Hopper valve opening system to become hydraulic. Enactment of ship feasibility deterrence, so that HCT from ship Cranes does not slow down Hopper performance. Thus PT. Varia Usaha Bahari can improve bulk cargo demolition services at the Special Port of PT. Semen Indonesia branch of Tuban. Keywords : Effectiveness, Hopper, Hock Cycle Time (HCT), Bulk Cargo.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Effectiveness, Hopper, Hock Cycle Time (HCT), Bulk Cargo. |
Subjects: | Skripsi Skripsi > TALK |
Divisions: | TALK |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 01 Feb 2019 08:27 |
Last Modified: | 06 Feb 2019 03:38 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/763 |
Actions (login required)
View Item |