BELLA, OCTAVIA SAHARA (2017) ANALISIS DISTRIBUSI BONGKAR MUAT MUATAN AVTUR DI MT. SINAR EMAS. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text
15. BAB II.pdf Download (848kB) | Preview |
|
Text
17. BAB IV.pdf Restricted to Registered users only Download (1MB) |
||
Text
16. BAB III.pdf Restricted to Registered users only Download (580kB) |
||
|
Text
18. LAMPIRAN GAMBAR.pdf Download (1MB) | Preview |
|
|
Text
18. BAB V.pdf Download (607kB) | Preview |
|
|
Text
20. SHIP PARTICULAR.pdf Download (18MB) | Preview |
|
|
Text
0. JUDUL.pdf Download (504kB) | Preview |
|
|
Text
4. HALAMAN PERNYATAAN.pdf Download (16MB) | Preview |
|
|
Text
3. HALAMAN PENGESAHAN.pdf Download (18MB) | Preview |
|
|
Text
2. HALAMAN PERSETUJUAN.pdf Download (34MB) | Preview |
|
|
Text
5. MOTTO.pdf Download (4MB) | Preview |
|
|
Text
6 HALAMAN PERSEMBAHAN.pdf Download (455kB) | Preview |
|
|
Text
19. Daftar Pustaka.pdf Download (605kB) | Preview |
|
|
Text
7. KATA PENGANTAR 2.pdf Download (16MB) | Preview |
|
|
Text
7 KATA PENGANTAR.pdf Download (533kB) | Preview |
|
|
Text
8 DAFTAR ISI.pdf Download (541kB) | Preview |
|
|
Text
9 DAFTAR GAMBAR.pdf Download (529kB) | Preview |
|
|
Text
13. ABSTRACT.pdf Download (616kB) | Preview |
|
|
Text
10. DAFTAR TABEL.pdf Download (534kB) | Preview |
|
|
Text
11. DAFTAR LAMPIRAN.pdf Download (599kB) | Preview |
|
|
Text
14. BAB I.pdf Download (725kB) | Preview |
|
|
Text
12. ABSTRAKSI.pdf Download (618kB) | Preview |
|
|
Text
29. NOR.pdf Download (16MB) | Preview |
|
|
Text
30. LETTER OF PROTEST.pdf Download (16MB) | Preview |
|
|
Text
31. SHIP SHORE SAFETY CHECKLIST.pdf Download (18MB) | Preview |
|
|
Text
32. PORT LOG.pdf Download (18MB) | Preview |
|
|
Text
31. SHIP SHORE SAFETY CHECKLIST2.pdf Download (18MB) | Preview |
|
|
Text
31. SHIP SHORE SAFETY CHECKLIST3.pdf Download (18MB) | Preview |
|
|
Text
33. CHECK TO BE CARRY OUT.pdf Download (17MB) | Preview |
|
|
Text
34. BALLAST ORDER SHEET.pdf Download (16MB) | Preview |
|
|
Text
35. PUMP ROOM ENTRANCE RECORD.pdf Download (17MB) | Preview |
|
|
Text
31. SHIP SHORE SAFETY CHECKLIST4.pdf Download (17MB) | Preview |
|
|
Text
36. TANKER TIME SHEET1.pdf Download (17MB) | Preview |
|
|
Text
37. RECORD OF CHECKLIST TEMPERATURE.pdf Download (17MB) | Preview |
|
|
Text
23. LETTER OF DISPREPENCY.pdf Download (16MB) | Preview |
|
|
Text
25. DOS1.pdf Download (17MB) | Preview |
|
|
Text
27. LOADING INSTRUCTION 2.pdf Download (18MB) | Preview |
|
|
Text
26. DRY CERTIFICATE.pdf Download (16MB) | Preview |
|
|
Text
28. DISCHARGING INSTRUCTION1.pdf Download (17MB) | Preview |
|
|
Text
27. LOADING INSTRUCTION1.pdf Download (17MB) | Preview |
|
|
Text
39. DAFTAR RIWAYAT HIDUP.pdf Download (481kB) | Preview |
|
|
Text
38. wawancara analisis distribusi muat bongkar muatan avtur.pdf Download (629kB) | Preview |
|
|
Text
21. CREW LIST.pdf Download (18MB) | Preview |
|
|
Text
22. COMPARTEMEN LOGSHEET.pdf Download (18MB) | Preview |
|
|
Text
38. wawancara analisis distribusi muat bongkar muatan avtur.pdf Download (629kB) | Preview |
|
|
Text
39. DAFTAR RIWAYAT HIDUP.pdf Download (481kB) | Preview |
Abstract
Bella Octavia Sahara, 2017, NIT: 50134835.N, “Analyze Distributing Loading and Unloading Cargo Avtur in MT. Sinar Emas”, skripsi Nautical Study Program, Diploma IV Program, Politeknik Ilmu Pelayaran Semarang, Counselor I: Dr. Capt. Suwiyadi, M.Pd., M.Mar, Counselor II: Sri Murdiwati, S.Sos, M.Si The main objective of the voyage is to distribute the loading and unloading of avtur in 3 unloading ports. In achieving these objectives can be determined from the steps undertaken to distribute the aviation load, the amount of loaded and unloaded load, and the calculation of the difference in the amount of avtur load dismantled. The method used by the researchers to solve the problem is qualitative, quantitative method with data analysis method of Urgency, Seriousness, Growth (USG) to determine priority problem when distributing loading and unloading of cargo avtur load so that you can find the solution of the problem. From the calculation of the priority of the problem, the most influential distribution in the process of loading and unloading. Sources of data from this study came from the observation of handling cargo on board during the period of January 2016 until July 2016, then processed using Microsoft excel. The results showed: the steps taken by preparing administration and physical, planning with make a stowage plan, coordination intern and also extern, implementation distribution loading and unloading process, and evaluation for the calculation the cargo. Large load of avtur loaded and unloaded MT. Sinar Emas different in number at each loading port because of the amount of load required and there are some different between shore figure and ship figure, the state of the tank, the load pipe, the evaporation and leakage. From the results of the study can be concluded that at each port and area need different avtur load with the same process and speed of unloading time in each port also vary. Keywords: Analyze, Distribution, Loading, Unloading, Avtur
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | Skripsi Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Users 4 not found. |
Date Deposited: | 28 Jan 2019 01:24 |
Last Modified: | 28 Jan 2019 01:24 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/233 |
Actions (login required)
View Item |