ANALISIS TERJADINYA KEBOCORAN PIPA AIR PADA AUXILIARY BOILER DI MV. DK 01

DAVID, MARSELA KURNIAWAN (2018) ANALISIS TERJADINYA KEBOCORAN PIPA AIR PADA AUXILIARY BOILER DI MV. DK 01. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img]
Preview
Text (ABSTRAK)
012.Abstraksi--OKE.pdf

Download (521kB) | Preview
[img]
Preview
Text (ABSTRACT)
013. ABSTRACTION.pdf

Download (512kB) | Preview
[img]
Preview
Text (BAB I)
BAB 1 oke.pdf

Download (422kB) | Preview
[img]
Preview
Text (BAB II)
BAB II oke.pdf

Download (398kB) | Preview
[img] Text (BAB III)
BAB III oke.pdf
Restricted to Registered users only

Download (568kB) | Request a copy
[img]
Preview
Text (LAMPIRAN 1)
Lampiran 1 wawancara kkm.pdf

Download (289kB) | Preview
[img]
Preview
Text (DAFTAR RIWAYAT HIDUP)
DAFTAR RIWAYAT HIDUP.pdf

Download (333kB) | Preview
[img]
Preview
Text (BAB V)
BAB V oke.pdf

Download (186kB) | Preview
[img]
Preview
Text (LAMPIRAN 1)
Lampiran 1 wawancara masinis 3.pdf

Download (292kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (264kB) | Preview
[img]
Preview
Text (LAMPIRAN)
Lampiran Manual Book.pdf

Download (1MB) | Preview
[img]
Preview
Text (LAMPIRAN SHIP PARTICULAR)
Lampiran Ship Particular.pdf

Download (418kB) | Preview
[img]
Preview
Text (COVER)
00.-cover.pdf

Download (228kB) | Preview
[img] Text (BAB IV)
BAB IV oke.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img]
Preview
Text (HALAMAN JUDUL)
01.-Halaman-judul.pdf

Download (229kB) | Preview
[img]
Preview
Text (HALAMAN PERSETUJUAN)
02. Hal persetujuan.pdf

Download (416kB) | Preview
[img]
Preview
Text (HALAMAN PENGESAHAN)
03. Hal pengesahan.pdf

Download (413kB) | Preview
[img]
Preview
Text (HALAMAN PERNYATAAN)
04. Hal pernyataan.pdf

Download (407kB) | Preview
[img]
Preview
Text (MOTTO)
05.Motto-OKE.pdf

Download (321kB) | Preview
[img]
Preview
Text (KATA PENGANTAR)
07.-KATA-PENGANTAR.pdf

Download (298kB) | Preview
[img]
Preview
Text (HALAMAN PERSEMBAHAN)
06.Halaman-Persembahan-OKE.pdf

Download (286kB) | Preview
[img]
Preview
Text (DAFTAR ISI)
08.Daftar Isi OKE.pdf

Download (229kB) | Preview
[img]
Preview
Text (DAFTAR GAMBAR)
09.Daftar-gambar.pdf

Download (323kB) | Preview
[img]
Preview
Text (DAFTAR TABEL)
010.Daftar-Tabel.pdf

Download (257kB) | Preview
[img]
Preview
Text (LAMPIRAN)
011.daftar-lampiran.pdf

Download (321kB) | Preview
Official URL: http://www.library.pip-semarang.ac.id

Abstract

David Marsela Kurniawan, 2018, NIT : 51145341. T. “Analysis of Auxiliary Boiler Water tube leaking on MV DK 01”, minithesis for Engineering Department Program, Diploma IV Program, Merchant Marine Academy Semarang, Lecture I : H. Sumarno P.S., MM, M. Mar.E and Lecture II: Henny Wahyu W, M.Pd Auxiliary Boiler is a closed vessel that produces steam with the pressure of about 1 atmosphere, with the way of heating Boiler water inside of it with hot gases from the combustion of fuel “. That steam is used for supporting engine operations and other ship necessities like heating fuel, lubricating oil, for kitchen necessities and bathroom, also deck and engine room. To fulfiil the needs of pressured steam, remembering the pressured steam is important for the ships operations. The pressured steam can be achieved when Auxiliary Boiler system works normally, so the Auxiliary Boiler has its normal pressure limit up to 6,0 kg/cm2 and water volume 8,68 m3. Therefore, knowledge of Auxiliary Boiler, especially its vulnerable are parts is required. The methode used ijn this research are Fishbone method or cause and Effect method and Fault Tree Analysis. Fishbone or cause and effect uses one of QC 7 tools that is used for identifyng relationship between cause and effect so the root of the problem can be found. Fault Tree Analysis is a tecnique used identifying risks triggering failure. The tecnique of collecting data is done with observation, documentation, and directly to the subject related to Auxiliary Boiler. The result achieved from this research is that leaking of Auxiliary Boiler water pipes is because the treatment and checking of Auxiliary Boiler water pH are not done properly, and it makes the water become acidic and causes corrosion and leaking of the pipes. The leaking of Auxiliary Boiler water pipes causes decrease of number of pipes and steam production produced affects the ship’s operation delay. To solve the problem above, checking and treatment of water Boiler is required and done properly, so the corrosion can be avoided. Keywords : Auxiliary Boiler, water pipes, pH, corrosion

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Auxiliary Boiler, water pipes, pH, corrosion
Subjects: Skripsi > Teknika
Divisions: Teknika
Depositing User: Mr Agus Wahyudi
Date Deposited: 07 Feb 2019 03:24
Last Modified: 07 Feb 2019 03:24
URI: http://repository.pip-semarang.ac.id/id/eprint/964

Actions (login required)

View Item View Item