ARTI, KUSUMA PUTRI (2018) MANAJEMEN PERGANTIAN MUATAN DARI MUATAN BUTADIENE KE LPG MIX (PROPANE DAN BUTHANE) DI MT. GAS NURI ARIZONA. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text (BAB 2)
BAB II FIX.pdf Download (512kB) | Preview |
|
|
Text (PENGESAHAN)
PENGESAHAN.pdf Download (326kB) | Preview |
|
Text (BAB 3)
BAB III FIX.pdf Restricted to Registered users only Download (300kB) | Request a copy |
||
Text (BAB 4)
BAB IV FIX.pdf Restricted to Registered users only Download (585kB) | Request a copy |
||
|
Text (PERSETUJUAN)
PERSETUJUAN.pdf Download (318kB) | Preview |
|
|
Text (BAB 5)
BAB V.pdf Download (263kB) | Preview |
|
|
Text (SHIP PARTICULARS)
2. SHIP PARTICULARS.pdf Download (242kB) | Preview |
|
|
Text (JUDUL)
1. HALAMAN JUDUL.pdf Download (265kB) | Preview |
|
|
Text (PERSEMBAHAN)
PERSEMBAHAN.pdf Download (199kB) | Preview |
|
|
Text (MOTTO)
5. HALAMAN MOTTO.pdf Download (338kB) | Preview |
|
|
Text (DAFTAR ISI)
8. DAFTAR ISI.pdf Download (263kB) | Preview |
|
|
Text (DAFTAR RIWAYAT HIDUP)
5. DAFTAR RIWAYAT HIDUP.pdf Download (260kB) | Preview |
|
|
Text (KATA PENGANTAR)
7. KATA PENGANTAR.pdf Download (333kB) | Preview |
|
|
Text (TABEL)
9. DAFTAR TABEL.pdf Download (301kB) | Preview |
|
|
Text (DAFTAR LAMPIRAN)
11. DAFTAR LAMPIRAN.pdf Download (257kB) | Preview |
|
|
Text (DAFTAR GAMBAR)
10. DAFTAR GAMBAR.pdf Download (258kB) | Preview |
|
|
Text (ABSTRAK)
ABSTRAKSI (Eng & Id).pdf Download (375kB) | Preview |
|
|
Text (BAB 1)
BAB I FIX.pdf Download (423kB) | Preview |
Abstract
Arti Kusuma Putri, 2018, NIT: 51145208 N, “Manajemen Pergantian Muatan dari Muatan Butadiene ke LPG MIX (Propane & Buthane) di MT. Gas Nuri Arizona”. Nautical Departmen, Diploma IV Program, Semarang Merchant Marine Polytechnics, 1st Supervisor : Capt. Hadi Supriyono, MM, M.Mar. dan 2nd Supervisor : F. Pambudi Widiatmaka, ST, MT., M.Mar.E. LPG Carrier is one of the vessels which carries gas that is being liquefied. Every gas tanker has different characteristic, both in handling the load and the carriage system. MT. Gas Nuri Arizona is a vessel with Fully Pressurized type which designed to load huge amount of LPG and Liquefied gas. The purpose of this research are, to know the preparation before loading, the activity of load-changing from Butadiene to LPG MIX (Propane and Buthane), obstacles, and the efforts to prevent any harms. From the research that had been done in sea project on MT. Gas Nuri Arizona about the management of load-changing from butadiene to LPG, this research use Fishbone Analysis Method which supported with Fishbone Diagram, and the data gathered by observation, by observibg the object directly, interview with the respondents of crew MT. Gas Nuri Arizona, and supported with documentation method. From the research above, we can conclude that with increasing knowledge by doing traing and giving instruction of the loading-Discharging procedure, duty and responsibilities of every crew, also hold safety meeting for all of the crews to give information on preparation and activities before the event, and a routinely monitor from officers on duty to minimize the obstacles at load changing form Butadiene to LPG MIX (Propane and Buthane). Keyword : Butadiene, LPG, Fully Pressurized.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Butadiene, LPG, Fully Pressurized. |
Subjects: | Skripsi Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 06 Feb 2019 08:14 |
Last Modified: | 06 Feb 2019 08:14 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/915 |
Actions (login required)
View Item |