MUHAMMAD, DANANG KURNIADI (2017) PELAKSANAAN BONGKAR MUAT CLINKER PADA MV. AZZAHRA DI PELABUHAN. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text (COVER)
COVER.pdf Download (4MB) | Preview |
|
|
Text (DAFTAR PUSTAKA, LAMPIRAN)
daftar pustaka, lampiran.pdf Download (5MB) | Preview |
|
|
Text (BAB 2)
BAB 2.pdf Download (5MB) | Preview |
|
|
Text (BAB 1)
BAB 1.pdf Download (3MB) | Preview |
|
Text (BAB 3)
BAB 3.pdf Restricted to Registered users only Download (3MB) | Request a copy |
||
|
Text (BAB 5)
BAB 5.pdf Download (5MB) | Preview |
|
Text (BAB 4)
BAB 4.pdf Restricted to Registered users only Download (3MB) | Request a copy |
Abstract
Muhammad Danang Kurniadi, 49124327, 2017 : "Implementation of the loading and unloading of clinker at MV. Azzahra at the port, "Nautical Studies Program, Diploma Program IV, Polytechnic Studies Sailing Semarang, Supervisor I: Capt. Eko Murdiyanto, M.Pd., M.Mar., Supervisor II: Andi Wahyu Hermanto, M.T In the implementation of loading cargo, the necessary preparations to be carried out by the vessel to support the smooth loading process, both gross payload or cargo net. After making observations writer wanted to know how the implementation and preparation of hatch clinker loading into optimal after unloading clinker. By looking at this, the authors are interested in researching on "Implementation Unloading Clinker On MV. Azzahra At the Port ". In this study the authors use qualitative methods which generate data descriptive form of written words of the people and observed behavior by collecting data such as the approach to the object through observation, interviews directly to the subject matter as well as the use of documents and data relating to the preparation of loading , It intends to determine several things related to the preparation for the loading of cargo on board, which includes, on the need for the implementation of the hold-dry maximally prior to loading cargo began, how the preparation of cleaning equipment is already prepared what mash a lot of obstacles, so the authors conducted a study thorough in every cleaning hold the implementation process. In the implementation of the hold dry gross payload once preparations loading, is based on the theory and also publications in which there are the terms given to the ship should carry out dry before loading cargo, and therefore hold cleaning is very important and must be implemented to the fullest due will be conducted survey by cargo surveyor who is a valuation team escape hatch whether to accept the charge. From preparation sweeping, spraying hatch, the drying process, the implementation of loading, how memepersiapkan hold cleaning equipment and cleaning schedule In order to ensure effective and seevisien possible. in order to obtain maximum results. Keyword : Clinker, Cleaning, Azzahra
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Clinker, Cleaning, Azzahra |
Subjects: | Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 30 Jan 2019 08:42 |
Last Modified: | 06 Feb 2019 03:08 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/634 |
Actions (login required)
View Item |