AKHMAD, KHIRZIN KHASHIN (2017) UPAYA MENINGKATKAN KINERJA SHIP UNLOADER UNTUK MENGURANGI DEMURRAGE DI DERMAGA PT. ARPENI PRATAMA OCEAN LINE TANJUNG JATI B JEPARA. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text
7-kata pengantar.pdf Download (4MB) | Preview |
|
|
Text
8-Daftar Isi.pdf Download (4MB) | Preview |
|
|
Text
9-Daftar Gambar.pdf Download (4MB) | Preview |
|
|
Text
11-ABSTRAK.pdf Download (4MB) | Preview |
|
|
Text
10-Daftar Tabel.pdf Download (4MB) | Preview |
|
|
Text
12-ABSTRACT.pdf Download (4MB) | Preview |
|
Text
15-BAB III.pdf Restricted to Registered users only Download (4MB) | Request a copy |
||
|
Text
13-BAB I.pdf Download (4MB) | Preview |
|
|
Text
18-Daftar Pustaka.pdf Download (4MB) | Preview |
|
|
Text
19-TRANSKRIP WAWANCARA.pdf Download (4MB) | Preview |
|
|
Text
17-BAB V.pdf Download (4MB) | Preview |
|
Text
16-BAB IV.pdf Restricted to Registered users only Download (4MB) | Request a copy |
||
|
Text
14-BAB II.pdf Download (4MB) | Preview |
|
|
Text
APOL 158 - Despatch-Demurage Record 2016.pdf Download (4MB) | Preview |
|
|
Text
PSS 051 Time Sheets - 0171.pdf Download (4MB) | Preview |
|
|
Text
PSS 051 Time Sheets - 0174.pdf Download (4MB) | Preview |
|
|
Text
PSS 051 Time Sheets - 0172.pdf Download (4MB) | Preview |
|
|
Text
PSS 051 Time Sheets - 0175.pdf Download (4MB) | Preview |
|
|
Text
1-HALAMAN JUDUL.pdf Download (28kB) | Preview |
|
|
Text
PSS 051 Time Sheets - 0173.pdf Download (4MB) | Preview |
|
|
Text
2. halaman persetujuan.pdf Download (4MB) | Preview |
|
|
Text
6-HALAMAN PERSEMBAHAN.pdf Download (4MB) | Preview |
|
|
Text
3. halaman pengesahan.pdf Download (4MB) | Preview |
|
|
Text
5-MOTTO.pdf Download (4MB) | Preview |
|
|
Text
4-halaman pernyataan.pdf Download (4MB) | Preview |
Abstract
Akhmad Khirzin Khashin, NIT. 50135047.K, 2017 “Efforts To Increase Ship Unloader Performance To Reduce Demurrage At Jetty PT. Arpeni Pratama Ocean Line Tanjung Jati B Jepara”, Program Diploma IV, Port and Shipping Department, Merchant Marine Polytechnic of Semarang, Supervisor I: Irma Shinta Dewi, S.S., M.Pd and Supervisor II: Capt. Rudi Susanto, M.Pd Ship Unloader is one of the stevedoring tools on land used for stevedoring bulk cargo. Ship Unloader is also one tool that supports stevedoring activities. In order for demolition activities to run smoothly, it requires a maximum performance Ship Unloader. In the activity of discharge of bulk cargo at dock of Tanjung Jati B Jepara often happened delay which cause demurrage. One cause of the demurrage is the performance of Ship Unloader is less than the maximum. The purpose of this research is to know the cause of Ship Unloader work not maximal and improve performance of Ship Unloader to reduce demurrage. In this research method used is a qualitative research method that regulates a research method by using several aspects such as data collection through literature study, interview and documentation. From the results of the research can know the factors that cause Ship Unloader work is not optimal among other weather factors, operator Ship Unloader less skilled, the condition of payload, and lack of care on Ship Unloader. Based on research results should PT. Arpeni Pratama Ocean Line makes an effort with weather checks, giving skill to the new Ship Unloader operator, Loading Master checks the loading condition to avoid plugging. Ship Unloader must be held regularly and periodically. Thus PT. Arpeni Pratama Ocean Line can improve Ship Unloader performance to reduce demurrage. Keywords : Performance, Ship Unloader, Demurrage
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Performance, Ship Unloader, Demurrage |
Subjects: | Skripsi Skripsi > TALK |
Divisions: | TALK |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 28 Jan 2019 01:39 |
Last Modified: | 06 Feb 2019 01:29 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/326 |
Actions (login required)
View Item |