WAHYU, NURYANTO (2017) “OPTIMALISASI PENGGUNAAN SEWAGE PLANT DALAM RANGKA MENGURANGI PENCEMARAN DI LAUT DENGAN METODE USG DI MV.TSING MA BRIDGE” MV. TSING MA BRIDGE. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text
7. KATA PENGANTAR.pdf Download (4MB) | Preview |
|
|
Text
8. DAFTAR ISI.pdf Download (4MB) | Preview |
|
|
Text
9. ABSTRAKSI ABSTRACT.pdf Download (4MB) | Preview |
|
|
Text
10. DAFTAR GAMBAR.pdf Download (4MB) | Preview |
|
|
Text
11. DAFTAR TABEL.pdf Download (4MB) | Preview |
|
|
Text
12. DAFTAR LAMPIRAN GAMBAR.pdf Download (4MB) | Preview |
|
|
Text
13. BAB 1.pdf Download (4MB) | Preview |
|
|
Text
14. BAB 2.pdf Download (4MB) | Preview |
|
Text
15. BAB 3.pdf Restricted to Registered users only Download (4MB) | Request a copy |
||
Text
16. BAB 4.pdf Restricted to Registered users only Download (4MB) | Request a copy |
||
|
Text
19. LAMPIRAN GAMBAR.pdf Download (5MB) | Preview |
|
|
Text
18. DAFTAR PUSTAKA.pdf Download (4MB) | Preview |
|
|
Text
17. BAB 5.pdf Download (4MB) | Preview |
|
|
Text
21. DAFTAR RIWAYAT HIDUP.pdf Download (4MB) | Preview |
|
|
Text
20. LAMPIRAN WAWANCARA.pdf Download (4MB) | Preview |
|
|
Text
1. COVER.pdf Download (179kB) | Preview |
|
|
Text
2. HAL PERSETUJUAN.pdf Download (4MB) | Preview |
|
|
Text
3. HAL PENGESAHAN.pdf Download (4MB) | Preview |
|
|
Text
4. HAL PERNYATAAN.pdf Download (4MB) | Preview |
|
|
Text
6. HAL PERSEMBAHAN.pdf Download (4MB) | Preview |
|
|
Text
5. MOTTO.pdf Download (4MB) | Preview |
Abstract
Wahyu Nuryanto, 50134922 T, 2017 “Optimizing the use of sewage plants in order to reduce marine pollution by ultrasound method in MV. Tsing Ma Bridge”, Courses tecnichal department, Diploma Program IV, Merchant Marine Polythecnic Supervisor I : Agus Hendro Waskito, M. M., M.Mar.E, Supervisor II : Budi Joko Raharjo, M. M Sewage plant is the best type of vacuum sewage processing aids to exploit the vacuum in the pipes so that sewage can flow toward the tank with a little water volume, with the use of evac pump to create a vacuum, crushing and transfered sewage to a holding tank. Lack of vacuum can make sewage stalled in the toilet, because the flow of sewage and water carrying her was blocked by the air in the pipe, so it raises a new problem, namely air pollution by odor and the need for the activities of processing waste water and sewage are not used to be disturbed. This experiment conducted during the writers implementing the practice of sea on board MV. Tsing Ma Bridge independently owned Osaka Asihi Kayun for twelve months. Sources of data obtained directly from the research and secondary data obtained from litertatur’s about operational’s of sewage plant with a vacuum system. The results obtained from research on no vacuum in the sewage system caused by blockage of the flow of water by the incoming air, their bodies / dirt on pipes, pumps and does not decrease the ability of FD valve can’t closed meeting. This is due to lack of maintenance the system of pipes and pumps and spare improper election and human eror that led to the damage. cause that water does not flow due to blocked, which eventually air in the pipe can not be removed from the pump due to cavitation and damage the evac pump. Keywords: Sewage Plant , vacuum, maintenence.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Sewage Plant , vacuum, maintenence |
Subjects: | Skripsi > Teknika |
Divisions: | Teknika |
Depositing User: | Admin Admin Admin |
Date Deposited: | 27 Jan 2019 08:09 |
Last Modified: | 06 Feb 2019 01:27 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/287 |
Actions (login required)
View Item |