ANALISIS PENCEGAHAN KEGAGALAN PEMBAKARAN PADA BOILER DENGAN METODE USG DI MV. BRUSSELS BRIDGE

RESTU, KISTIA RAHARJO (2017) ANALISIS PENCEGAHAN KEGAGALAN PEMBAKARAN PADA BOILER DENGAN METODE USG DI MV. BRUSSELS BRIDGE. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img]
Preview
Text
4. ABSTRACT.pdf

Download (4MB) | Preview
[img]
Preview
Text
6. BAB II.pdf

Download (4MB) | Preview
[img]
Preview
Text
5. BAB I.pdf

Download (4MB) | Preview
[img] Text
7. BAB III.pdf
Restricted to Registered users only

Download (4MB) | Request a copy
[img]
Preview
Text
10. DAFTAR PUSTAKA.pdf

Download (4MB) | Preview
[img]
Preview
Text
11a. WAWANCARA.pdf

Download (4MB) | Preview
[img]
Preview
Text
9. BAB V.pdf

Download (4MB) | Preview
[img]
Preview
Text
11b. PEMISAH.pdf

Download (215kB) | Preview
[img] Text
8. BAB IV.pdf
Restricted to Registered users only

Download (5MB) | Request a copy
[img]
Preview
Text
11c. DAFTAR RIWAYAT HIDUP.pdf

Download (4MB) | Preview
[img]
Preview
Text
12. PROSIDING.pdf

Download (4MB) | Preview
[img]
Preview
Text
HALAMAN PENGESAHAN.pdf

Download (4MB) | Preview
[img]
Preview
Text
HALAMAN PERSETUJUAN.pdf

Download (4MB) | Preview
[img]
Preview
Text
1b. JUDUL SKRIPSI.pdf

Download (194kB) | Preview
[img]
Preview
Text
1a. COVER.pdf

Download (193kB) | Preview
[img]
Preview
Text
2d. kata pengantar.pdf

Download (4MB) | Preview
[img]
Preview
Text
2C. PERNYATAAN.pdf

Download (4MB) | Preview
[img]
Preview
Text
2f. DAFTAR TABEL.pdf

Download (4MB) | Preview
[img]
Preview
Text
2e. DAFTAR ISI.pdf

Download (4MB) | Preview
[img]
Preview
Text
2g. DAFTAR GAMBAR.pdf

Download (4MB) | Preview
[img]
Preview
Text
2h. MOTTO.pdf

Download (4MB) | Preview
[img]
Preview
Text
3. ABSTRAKSI.pdf

Download (4MB) | Preview
Official URL: http://www.library.pip-semarang.ac.id

Abstract

Restu Kistia Raharjo, NIT. 50134977.T, 2017 “Analysis Prevention of Failure Boiler Burning by USG at MV. Brussels Bridge”, Program Diploma IV, Technical, Marchant Marine Polytechnic of Semarang, 1st Supervision: Abdi Seno, M.Si., M.Mar.E and 2nd Supervision: Febria Surjaman, MT. The boiler is a steam formed with pressure more than 1 (one) atmosphere, by heating the water in a closed tube by hot gases who produced from combustion fuel oil in the boiler combustion chamber, and the result is high-pressure hot steam. At this time the boiler that we know is divided into two kinds, that are boiler fire pipe and boiler water pipe. Boiler water pipe is more widely used than boiler fire pipe due to easier to maintenance and high efficiency. Therefore, the boiler must be treated properly, so that the process of steam formation can flowed properly. The method that used in this scription is descriptive qualitative method by USG as a method to determine the priority of the problem. The formulation of the problem for this research are what’s factors that can caused the failure of boiler burning, what’s impacts, and what’s efforts that are made to existing the problem. From this research, we can concluded that the cause of failure boiler burning is the clogging of atomizer, incompatibility of electrode distance, dirty fuel oil heater and bad quality of fuel. The impacts of the causal factors are the failure of boiler burning, and the effort to avoid failure boiler burning are clean up the atomizer, remeasure the distance between electrodes according to the distance in instruction manual book, clean up the fuel oil heater , and than controlling the quality of fuel oil. Key Words : Analysis, Prevention of Failure, Burning, Boiler

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Analysis, Prevention of Failure, Burning, Boiler
Subjects: Skripsi > Teknika
Divisions: Teknika
Depositing User: Unnamed user with email dannupurwanto07@gmail.com
Date Deposited: 25 Jan 2019 07:49
Last Modified: 06 Feb 2019 01:25
URI: http://repository.pip-semarang.ac.id/id/eprint/238

Actions (login required)

View Item View Item