PELAKSANAAN BONGKAR MUAT DENGAN MENGGUNAKAN CRANE KAPAL DI MV. ORIENTAL JADE

DANANG, WAHYUTIYANTO PERTAMA (2018) PELAKSANAAN BONGKAR MUAT DENGAN MENGGUNAKAN CRANE KAPAL DI MV. ORIENTAL JADE. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img] Text (Halaman Persembahan)
6 -HALAMAN PERSEMBAHAN.PDF

Download (1MB)
[img] Text (Kata Pengantar)
7 -KATA PENGANTAR.PDF

Download (1MB)
[img] Text (Daftar Isi)
8 -DAFTAR ISI.PDF

Download (1MB)
[img] Text (Abstract)
9 -ABSTRACT.PDF

Download (0B)
[img] Text (Abstrak)
9 -ABSTRAKSI.PDF

Download (0B)
[img] Text (Daftar Gambar)
10 -DAFTAR GAMBAR.PDF

Download (0B)
[img] Text (Daftar Lampiran)
11 -DAFTAR LAMPIRAN.PDF

Download (1MB)
[img] Text (BAB 1)
12 -BAB I PENDAHULUAN.PDF

Download (0B)
[img] Text (BAB V)
16 -BAB V PENUTUP.PDF

Download (1MB)
[img] Text (Daftar Pustaka)
17 -DAFTAR PUSTAKA.PDF

Download (1MB)
[img] Text (Lampiran)
18 -LAMPIRAN 1.PDF

Download (0B)
[img] Text (Lampiran)
19 -LAMPIRAN 2.PDF

Download (0B)
[img] Text (Lampiran)
20 -LAMPIRAN 3.PDF

Download (0B)
[img] Text (Lampiran)
21 -LAMPIRAN 4.PDF

Download (0B)
[img] Text (Lampiran)
24 -LAMPIRAN 7.PDF

Download (0B)
[img] Text (Lampiran)
22 -LAMPIRAN 5.PDF

Download (0B)
[img] Text (Lmapiran)
23 -LAMPIRAN 6.PDF

Download (0B)
[img] Text
25 -SHIP PARTICULAR.PDF

Download (0B)
[img] Text (Halaman Judul)
1 -HALAMAN JUDUL.PDF

Download (0B)
[img] Text (BAB III)
14 -BAB III METODE PENELITIAN.PDF
Restricted to Registered users only

Download (4MB) | Request a copy
[img] Text (BAB IV)
15 -BAB IV PEMBAHASAN MASALAH.PDF
Restricted to Registered users only

Download (4MB) | Request a copy
Official URL: http://www.library.pip-semarang.ac.id

Abstract

ABSTRACT Danang W. Pertama, 2018, NIT. 50134776 N, “Implementation of loading and unloading using a ship's crane in MV. Oriental Jade”, Program D IV, Semarang Merchant Marine Polytechnic, Lecture I: Capt. Eko Murdiyanto, M.Pd M.Mar, Lecture II: Vega Fonsula Andromeda, S.St.,S.Pd Implementation of loading and unloading using a ship's crane must be carried out properly and handling loads that exceed SWL crane vessels. On this basis the author formulates the problem of how the loading and unloading practices using the ship's crane in MV. Oriental Jade and what if the load exceeds the SWL crane of the ship. The method used in this study is a qualitative method that produces descriptive data in the form of written words from people and observed behavior. In this case collecting data in the form of approach to the object through observation, interview directly to the subject and using documents and data related to the implementation of loading and unloading by using a ship crane. Based on the results of research conducted during the screen practice author in MV. Oriental Jade on loading and unloading activities using a ship's crane found problems encompassing crane preparations that were too long, unloading tools partly improper, wirerope worn out. In loading and unloading operations, the load exceeds the SWL crane and consequently the charge can not be lifted by a crane so that two cranes are combined so that the load is not too heavy and the load raised with HMC (Harbor Mobile Crane). With good preparation before loading and unloading by using crane determine the smooth and not implementation of loading and unloading. If on the ground there is HMC (Harbor Mobile Crane) better to use HMC (Harbor Mobile Crane) instead of using ship crane, because HMC (Harbor Mobile Crane) has larger SWL than ship crane and to be safer to minimize work accident and protect ship crew and payload. Keywords: Loading and unloading, Ship crane, SWL crane

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Loading and unloading, Ship crane, SWL crane
Subjects: Skripsi
Skripsi > Nautika
Divisions: Nautika
Depositing User: Unnamed user with email dannupurwanto07@gmail.com
Date Deposited: 31 Jan 2019 03:12
Last Modified: 06 Feb 2019 02:05
URI: http://repository.pip-semarang.ac.id/id/eprint/677

Actions (login required)

View Item View Item