ANALISIS PROSES PEMBONGKARAN MUATAN BATU BARA DI KAPAL MV. INTAN BARUNA DI PLTU HOLTEKAMP JAYAPURA

RIZAL, NUR RAHMAN (2019) ANALISIS PROSES PEMBONGKARAN MUATAN BATU BARA DI KAPAL MV. INTAN BARUNA DI PLTU HOLTEKAMP JAYAPURA. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img] Pdf (51145132N_SKRIPSI_FULLTEXT)
51145132N_SKRIPSI_FULLTEXT.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Pdf (51145132N_SKRIPSI_OPEN_ACCESS)
51145132N_OPEN_ACCESS.pdf

Download (765kB)
Official URL: http://www.library.pip-semarang.ac.id

Abstract

ABSTRAKSI Rizal Nur Rahman, 51145132 N, 2019, “Analisis Proses Pembongkaran Muatan Batu Bara Di Kapal Mv. Intan Baruna Di PLTU Holtekamp Jayapura”, Diploma IV, Nautika, Politeknik Ilmu Pelayaran Semarang, Pembimbing: (I) Capt. Hadi Supriyono, M.Mar, M.M. (II) R.A.J Susilo Hadi Wibowo, S.IP., M.M. Pada tanggal 30 April 2017 kapal MV. Intan Baruna sedang melaksanakan pembongkaran muatan batu bara di PLTU Holtekamp Jayapura dan terjadi suatu permasalahan diantaranya adalah keterlambatan pembongkaran. Hal ini disebabkan karena sering terjadi kerusakan pada peralatan muat bongkar seperti Hydraulic Cilinders yang patah dan putusnya wire grab pada saat proses bongkar muatan, kerusakan ini dikarenakan perawatan tidak tepat pada peralatan bongkar tersebut sehingga mengakibatkan keterlambatan. Tujuan dari penelitian adalah untuk mengetahui penyebab-penyebab terjadinya keterlambatan pada saat proses pembongkaran muatan batu bara dan untuk menjalankan upaya-upaya yang dilakukan dalam menanggulangi permasalahan yang terjadi guna meningkatkan kelancaran proses pembongkaran muatan Metode penelitian yang digunakan peneliti dalam menyampaikan masalah adalah metode kualitatif dengan menghasilkan data deskriptif untuk menggambarkan dan menguraikan objek yang diteliti. Peneliti menggunakan teknik analisa data USG (Urgency, Seriousness, Growth) untuk menentukan masalah yang menjadi prioritas utama dalam masalah keterlambatan pembongkaran muatan sehingga dapat ditemukan pemecahannya. Dari hasil penelitain diatas dapat disimpulkan bahwa yang menyebabkan proses proses bongkar muatan batu bara kapal di PLTU Holtekamp Jayapura mengalami keterlambatan adalah faktor rusaknya alat bongkar muat, hal ini dikarenakan kurangnya ketelitian para crew dalam melaksanakan perawatan pada alat bongkar muat di atas kapal. Tindakan yang dilakukan untuk mengatasi keterlambatan pembongkaran batu bara tersebut yaitu dengan melakukan perawatan khusus kepada alat bongkar muat saat dari pelabuhan muat ke bongkar atau dari pelabuhan muat ke bongkar. ABSTRACT Rizal Nur Rahman, 51145132 N, 2019, "Analysis of the Process Discharging of Coal Cargo on Ship MV. Intan Baruna in the PLTU Holtekamp Jayapura", Diploma IV, Nautika, Semarang Merchant Marine Polytechnic, Advisor: (I) Capt. Hadi Supriyono, M.Mar, M.M. (II) R.A.J Susilo Hadi Wibowo, S.IP., M.M. On April 30, 2017 the MV. Intan Baruna is carrying out the discharge of coal loads at the PLTU Holtekamp Jayapura and a problem has occurred including delays in discharge. This is due to frequent damage to loading and unloading equipment such as broken Hydraulic Cilinders and wire grabs during the loading and unloading process, this damage is due to improper maintenance of the unloading equipment resulting in delays. The purpose of the research is to find out the causes of delays during the process of dismantling coal loads and to carry out efforts made in overcoming the problems that occur to improve the smooth process of loading and unloading. The research method used by researchers in conveying problems is a qualitative method by producing descriptive data to describe and describe the object under study. The researcher used the technique of analyzing USG data (Urgency, Seriousness, Growth) to determine the problem which was the top priority in the matter of the delay in the dismantling of the cargo so that the solution could be found. From the results of the research above, it can be concluded that the delay in the loading and unloading process of ships at the PLTU Holtekamp Jayapura is a factor in the breakdown of loading and unloading equipment, due to a lack of accuracy of the crew in carrying out loading and unloading equipment on board. The action taken to overcome the delay in the discharging of coal is by carrying out special maintenance for loading and unloading equipment from the port loading to unloading or from the port loading to unloading

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Kata kunci: proses bongkar muat, batu bara, metode USG, perawatan Keywords: loading and unloading process, coal, ultrasound method, maintenance
Subjects: Skripsi > Nautika
Divisions: Nautika
Depositing User: Unnamed user with email perpustakaan@pip-semarang.ac.id
Date Deposited: 14 Jan 2020 13:39
Last Modified: 14 Jan 2020 13:39
URI: http://repository.pip-semarang.ac.id/id/eprint/2282

Actions (login required)

View Item View Item