SALMAN, ALFARISI (2019) MANAJEMEN PENANGANAN GENERAL CARGO CONTAINER DI MV. ORIENTAL EMERALD. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
Pdf (49124497N_SKRIPSI_FULLTEXT)
49124497N_Skripsi_Fulltext.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
|
Pdf (49124497N_SKRIPSI_OPEN_ACCESS)
49124497N_Open_Access.pdf Download (784kB) |
Abstract
ABSTRAKSI Salman Alfarisi, 2019. NIT: 49124497 N, “Manajemen Penanganan General Cargo Container di MV. Oriental Emerald”, Skripsi Program Studi Nautika, Program Diploma IV, Politenik Ilmu Pelayaran Semarang, Pembimbing I: Dr. Capt. M. Suwiyadi, S.Pd., M.Pd, Pembimbing II: Amad Narto, M.Pd., M.Mar.E. MV. Oriental Emerald adalah kapal container yang dirancang untuk mengangkut muatan container box dalam jumlah besar. Sebagai distributor dalam membawa muatan container dari satu tempat ke tempat lainnya, kapal sempat mengalami kendala yang mengakibatkan proses bongkar muat terhambat dan peletakan kontainer di atas kapal tidak sesuai dengan bay plan. Metode penelitian yang digunakan adalah deskriptif kualitatif. Hasil penelitian menunjukkan bahwa terhambatnya proses bongkar muat dan salahnya peletakan kontainer di MV. Oriental Emerald disebabkan kurangnya komunikasi antara pihak kapal dengan foreman serta pengawasan yang kurang teliti. Dengan melaksanakan manajemen yang tepat terhadap penanganan general cargo container diharapkan tidak terjadi kendala apapun, sehingga kegiatan bongkar ataupun muat dapat berjalan dengan baik. ABSTRACT Salman Alfarisi, 2019. NIT: 49124497 N, “Manajemen Penanganan General Cargo Container di MV. Oriental Emerald”, Thesis Nautical Study Program, Diploma IV Program, Merchant Marine Polythecnic of Semarang, Advisor I: Dr. Capt. M. Suwiyadi, S.Pd., M.Pd, Advisor II: Amad Narto, M.Pd., M.Mar.E. MV. Oriental Emerald is container ship designed to carry payload container box in large numbers. As a distributor in the container carries from one place to another, the vessel had undergone constraints resulting in loading and discharging process was hampered and the placement of containers on board were not in accordance with the bay plan. The research method used is descriptive qualitative. The results showed that hampered the process of loading and discharging and harm the laying container on MV. Oriental Emerald due to lack of communication between the crew ship with foreman as well as the supervision of the less conscientious. By implementing proper management towards the handling of general cargo container is expected not to occur any obstacle, so that loading or unloading activities can be run well.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Kata kunci: Manajemen, penanganan general cargo container Keywords: Management, handling general cargo containers |
Subjects: | Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Admin Admin Admin |
Date Deposited: | 24 Jan 2020 08:38 |
Last Modified: | 24 Jan 2020 08:38 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/2220 |
Actions (login required)
View Item |