NURWACHID, EKA (2019) OPTIMALISASI PERAWATAN ALAT BONGKAR MUAT GUNA MEMPERLANCAR KEGITAN BONGKAR MUAT DIKAPAL SEMEN CURAH MV. DIAN CORDELIA. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
Pdf (52155606N_SKRIPSI_FULLTEXT)
52155606N_skripsi_fullset.pdf Restricted to Repository staff only Download (7MB) | Request a copy |
|
Pdf (52155606N_OPEN_ACCESS)
52155606N_Open_Access.pdf Download (4MB) |
Abstract
ABSTRAKSI Nurwachid Eka Prasetya, 2019, NIT : 52155606. N, “Optimalisasi Perawatan Alat Bongkar Muat Guna Memperlancar Kegitan Bongkar Muat Di Kapal Semen Curah MV. Dian Cordelia”, skripsi Program Studi Nautika,Program Diploma IV, Politeknik Ilmu Pelayaran Semarang, Pembimbing I: Capt. I Kadek Laju, S.H., M.M, Pembimbing II: Capt. Firdaus Sitepu, S.St, M.Si, M.M Agar pemuatan dan pembongkaran muatan semen di pelabuhan bisa tepat waktu sesuai dengan jadwal yang telah diperkirakan, maka alat bongkar muat merupakan salah satu faktor penting agar proses pemuatan dan pembongkaran berjalan lancar. Yang perlu diperhatikan agar peforma alat bongkar muat kapal dalam keadaan siap dan optimal untuk melaksanakan pemuatan adalah dengan cara menghindari dan meminimalisir faktor-faktor yang menyebabkan peforma alat bongkar tidak optimal. Berdasarkan pengalaman selama praktek berlayar di MV.Dian Cordelia banyak terjadi kendala pada alat bongkar muat di MV. Dian Cordelia yang menyebabkan terhambatnya kegiatan bongkar muat, beberapa permasalahan yang dihadapi yaitu: Apa faktor penyebab perawatan alat bongkar muat semen di MV. Dian Cordelia kurang optimal, apa saja akibat dari perawatan alat bongkar muat semen di MV. Dian Cordelia jika perawatan kurang optimal dan bagaimana tindakan perawatan alat bongkar muat semen dapat bekerja dengan optimal. Metode yang digunakan dalam penelitian ini adalah metode kualitatif yang menghasilkan data deskriptif berupa kata-kata tertulis dari objek yang diteliti, dalam hal ini mengumpulkan data berupa pendekatan terhadap obyek melalui wawancara terhadap sumber berpengalaman, melalui data-data yang berhubungan dengan proses bongkar muat semen di MV. Dian Cordelia. Penulis akan melakukan identifikasi penyebab hal itu terjadi dengan cara mengetahui penyebab kerusakan dari alat bongkar muat dan termasuk prosedur pembongkaran yang benar. Setelah teridentifikasi penyebab terhambatnya proses ketika bongkar muat, maka selanjutnya bisa dilakukan suatu penelitian guna mencari hal-hal yang menyebabkan terhambatnya bongkar muat. Dengan dilakukan penelitian ini, maka setiap kru kapal akan lebih konsisten dalam melakukan perawatan terhadap alat bongkar muat kapal semen dan diketahuinya hal-halyang tidak dapat ditoleransi maka dapat mengikuti prosedur bongkar muat dengan benar agar proses bongkar muat berjalan dengan lancar. Dilakukan pengawasan proses bongkar muat dan perawatan alat bongkar muat dimaksudkan untuk bisa mengoptimalkan proses bongkar muat. ABSTRACT Nurwachid Eka Prasetya, 2019, NIT : 52155606. N, “Optimalisation of loading and unloading equipment to support loading and unloading on Bulk Cement Vessel MV Dian Cordelia”. Essay of Nautical Program. Diploma IV Program. Politeknik Ilmu Pelayaran Semarang. 1st Mentor: Capt. I Kadek Laju, S.H., M.M. 2nd Mentor: Capt. Firdaus Sitepu, S.St, M.Si, M.M In order for loading and unloading of cement in ports to be on time according to the schedule, so loading and unloading equipment is one of the important factors so that the loading and unloading process runs smoothly. What needs to be considered so that the performance of ship loading and unloading equipment is ready and in optimal condition to carry out loading is by avoiding and minimizing the factors that cause the unloading performance to be not optimal. Based on experience during the sea practice, MV. Dan Cordelia had many problems with loading and unloading equipment, which caused problems on loading and unloading activities. Several problems were faced, namely: What were the factors that caused the maintenance of cement loading and unloading equipment in the MV. Dian Cordelia not optimal, what is the result of the maintenance of cement loading and unloading equipment in the MV. Dian Cordelia if the maintenance is not optimal and how can the cement loading and unloading equipment work optimally. The method used in this study is a qualitative method that produces descriptive data in the form of writing of the object under study, in this case collecting data in the form of an approach to the object through interviews with experienced sources, through data relating to the cement loading and unloading process in MV. Dian Cordelia. The author will identify the cause of this by analyzing the cause of the damage to the loading and unloading equipment and including the correct unloading procedure. After the cause of the obstruction in the causes of the process of loading and unloading had been identified, then a study can then be carried out to look for things that cause the loading and unloading to be hampered. By conducting this research, each ship crew will be more consistent in carrying out maintenance of the cement ship loading and unloading equipment and knowing things that cannot be tolerated, can properly following the loading and unloading procedures so that the loading and unloading process runs smoothly. Supervision of loading and unloading process and maintenance of loading and unloading equipment are intended to optimize the loading and unloading process.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Kata kunci: Optimalisasi, Perawatan, Alat Bongkar Muat Semen Curah Keywords: Optimization, Maintenance, Bulk Cement Loading Unloading Equipment |
Subjects: | Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Admin Admin Admin |
Date Deposited: | 30 Dec 2019 07:12 |
Last Modified: | 30 Dec 2019 07:12 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/2121 |
Actions (login required)
View Item |