I MADE, WAHYU SANDIKA PUTRA (2018) OPTIMALISASI PELAKSANAAN PLANNED MAINTENANCE SYSTEM (PMS) DECK DEPARTMENT DI KAPAL MV. ENERGY MIDAS. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
Text (BAB 2)
14. BAB II.PDF Download (325kB) |
|
Text (BAB 1)
13. BAB I.PDF Download (311kB) |
|
Text (BAB 5)
17. BAB V.PDF Download (331kB) |
|
Text (BAB 4)
16 BAB IV.PDF Restricted to Registered users only Download (0B) | Request a copy |
|
Text (BAB 3)
15. BAB III (FTA FISBN) .PDF Restricted to Registered users only Download (0B) | Request a copy |
|
Text (DAFTAR PUSTAKA)
18-DAFTAR PUSTAKA.PDF Download (191kB) |
|
Text (DAFTAR RIWAYAT HIDUP)
19-DAFTAR RIWAYAT HIDUP.PDF Download (298kB) |
|
Text (LAMPIRAN 2)
LAMPIRAN 2 LAUNCHING OF LIFEBOAT 23 .PDF Download (0B) |
|
Text (LAMPIRAN 3)
LAMPIRAN 3 ABANDON SHIP 2016.PDF Download (0B) |
|
Text (LAMPIRAN 4)
LAMPIRAN 4 SELF NON-CONFORMITY REPORT.PDF Download (0B) |
|
Text (LAMPIRAN 5)
LAMPIRAN 5 SELF NC 1 .PDF Download (0B) |
|
Text (LAMPIRAN 7)
LAMPIRAN 7.PDF Download (0B) |
|
Text (LAMPIRAN 8)
LAMPIRAN 8.PDF Download (0B) |
|
Text (LAMPIRAN 9)
LAMPIRAN 9.PDF Download (0B) |
|
Text (JUDUL)
1.-HALAMAN-JUDUL-COPY-1.PDF Download (0B) |
|
Text (LAMPIRAN 10)
LAMPIRAN 10.PDF Download (0B) |
|
Text (HALAMAN PERSETUJUAN)
2.-HALAMAN-PERSETUJUAN-COPY-1.PDF Download (0B) |
|
Text (HALAMAN PENGESAHAN)
3.-HALAMAN-PENGESAHAN.PDF Download (0B) |
|
Text (HALAMAN PERNYATAAN)
4.-HALAMAN-PERNYATAAN.PDF Download (0B) |
|
Text (MOTTO)
5.HALAMAN-MOTTO.PDF Download (0B) |
|
Text (HALAMAN PERSEMBAHAN)
6.-HALAMAN-PERSEMBAHAN.PDF Download (0B) |
|
Text (KATA PENGANTAR)
7 KATA PENGANTAR.PDF Download (0B) |
|
Text (DAFTAR ISI)
8 DAFTAR ISI.PDF Download (0B) |
|
Text (DAFTAR LAMPIRAN)
9 DAFTAR LAMPIRAN.PDF Download (0B) |
|
Text
10. DAFTAR TABELDOC.PDF Download (0B) |
|
Text (DAFTAR GAMBAR)
11. DAFTAR GAMBAR.PDF Download (0B) |
|
Text (ABSTRAK)
12. ABSTRAKSI.PDF Download (0B) |
Abstract
I Made Wahyu Sandika Putra. 51145151 N. “Optimilation Implementation of Planned Maintenance System (PMS) Deck Department on MV. Energy Midas“, thesis Nautika Study Program, Diploma IV Program, Politeknik Ilmu Pelayaran Semarang, Supervisor I: Capt. H.S. Sumardi S.H.,MM.,M.Mar, Supervisor II: Amad Narto M.Pd M.Mar.E Maintenance System in a periodical time can extend the life of a ship, and also to increase the productivity of the vessel. Relating to the maintenance of all components on a vessel are regulated in the International Safety Management Code (ISM Code) ) chapter 5, section 10 in Maintance Of The Ship And Equipment. On that basis need to be implemented system of maintenance plan or called with Planned Maintenance System (PMS) which have been applied by shipping company on board. In accordance with the problems encountered in the not optimal implementation of planned maintenance system (PMS) on the vessel impact on: lifeboat can not be increased or lowered and the operation of open closed hatch cover is constrained, so the operational and productivity of the ship was decreased. In this research, the method used is qualitative method and to analyze the problems using tools Fishbone and Fault Tree Analysis (FTA). In terms of collecting data, approaches to the object under study through observation, documentations, interviews and literature studies. By knowing the causal factors, it is hoped that immediate corrective and maintenance action can be taken according to Planned Maintenance System (PMS) so that the shipping and operational activities of the vessel run smoothly and no loss to the company or crew ship. At the end of this section of the thesis the author presents conclusions and suggestions. Keyword: Implementation of Planned Maintenance System
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Implementation of Planned Maintenance System |
Subjects: | Skripsi Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 08 Feb 2019 02:59 |
Last Modified: | 08 Feb 2019 02:59 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/993 |
Actions (login required)
View Item |