ANALISIS SULITNYA MENDAPATKAN JABATAN PUMPMAN DI PT. PERTAMINA (PERSERO) PERKAPALAN

YOGA, AJI PRADANA (2018) ANALISIS SULITNYA MENDAPATKAN JABATAN PUMPMAN DI PT. PERTAMINA (PERSERO) PERKAPALAN. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img] Text (BAB 4)
BAB IV FIX.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img]
Preview
Text (DAFTAR RIWAYAT HIDUP)
DAFTAR RIWAYAT HIDUP.pdf

Download (303kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (191kB) | Preview
[img]
Preview
Text (LAMPIRAN)
LAMPIRAN.pdf

Download (1MB) | Preview
[img]
Preview
Text (HALAMAN PEMBATAS)
HALAMAN PEMBATAS.pdf

Download (405kB) | Preview
[img]
Preview
Text (HALAMAN PERSETUJUAN)
2. HALAMAN PERSETUJUAN.pdf

Download (579kB) | Preview
[img]
Preview
Text (HALAMAN PENGESAHAN)
3. HALAMAN PENGESAHAN.pdf

Download (593kB) | Preview
[img]
Preview
Text (HALAMAN PERNYATAAN)
4. HALAMAN PERNYATAAN.pdf

Download (347kB) | Preview
[img]
Preview
Text (MOTTO)
5. MOTTO.pdf

Download (417kB) | Preview
[img]
Preview
Text (BAB 5)
BAB V FIX.pdf

Download (330kB) | Preview
[img]
Preview
Text (JUDUL)
1. HALAMAN JUDUL.pdf

Download (268kB) | Preview
[img]
Preview
Text (HALAMAN PERSEMBAHAN)
6. HALAMAN PERSEMBAHAN.pdf

Download (188kB) | Preview
[img]
Preview
Text (KATA PENGANTAR)
7. KATA PENGANTAR.pdf

Download (438kB) | Preview
[img]
Preview
Text (DAFTAR ISI)
8. DAFTAR ISI.pdf

Download (301kB) | Preview
[img]
Preview
Text (DAFTAR TABEL)
9. DAFTAR TABEL.pdf

Download (323kB) | Preview
[img]
Preview
Text (DAFTAR GAMBAR)
10. DAFTAR GAMBAR.pdf

Download (325kB) | Preview
[img]
Preview
Text (DAFTAR LAMPIRAN)
11. DAFTAR LAMPIRAN.pdf

Download (324kB) | Preview
[img]
Preview
Text (ABSTRACT)
13. ABSTRACT.pdf

Download (432kB) | Preview
[img]
Preview
Text (ABSTRAK)
12. ABSTRAK.pdf

Download (429kB) | Preview
[img]
Preview
Text (BAB 1)
BAB I FIX.pdf

Download (384kB) | Preview
[img]
Preview
Text (BAB 2)
BAB II FIX.pdf

Download (581kB) | Preview
[img] Text (BAB 3)
BAB III FIX.pdf
Restricted to Registered users only

Download (364kB) | Request a copy
Official URL: http://www.library.pip-semarang.ac.id

Abstract

Yoga Aji Pradana, 2018, NIT: 51145518 K, “Analysis of Difficulties to Get Pumpman Position at PT. Pertamina (Persero) Shipping”, mini thesis of Port And Shipping Department, Diploma IV Program, Semarang Merchant Marine Polytechnic, Supervisor I: Okvita Wahyuni, S.ST, MM, Supervisor II: Poernomo Dwi Atmojo, SH, MH Indonesia is an archipelago country that most of its territory consists of the sea, the sea transportation as a means of connecting and distribute of goods throughout the region. PT. Pertamina (Persero) Shipping, in the distribution of oil and gas operates a number of 71 units owned fleet. It takes the number of crew enough to support these activities. Problems that occur is the difficulties to get the position of Pumpman, which is a crew position of the ship included in the Deck Department on the Pertamina tanker. The number of Pumpman that are available and ready at PT. Pertamina (Persero) Shipping has not been sufficient. The purpose of this research is to identify the causes of difficulties to get the Pumpman position at PT. Pertamina (Persero) Shipping, identify the impacts, and identify efforts to solve the difficulties to get the Pumpman position. The method used by the researcher in this research is descriptive qualitative method. Sources of data used are primary data and secondary data. Methods of data collection on the object under research using the method of observation, interview method, documentation study and literature study. From the problem analysis, the difficulties to get Pumpman position is when making plotting crew plan, Crewing Department has difficulties in determining replacement Pumpman for Pumpman onboard whose Sea Employment Agreement period will be finished. This is because the lack of information related to the requirements and selection to become Pumpman, documents and certificates of proficiency are expired, and just few Pumpman is ready when called the company. The impact is the delay of Pumpman shifting that out of Sea Employment Agreement and the late payment of wages. Efforts are made to solve this problem is by performing recruitment tests, lowering passing grade selection, providing career or promotion to the Able Seaman to become Pumpman, as well as applying the extension of Sea Employment Agreement and facilitate the extension of proficiency certificates and related documents. Keywords: Pumpman, analysis, position.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Pumpman, analysis, position.
Subjects: Skripsi
Skripsi > KALK
Divisions: Ketatalaksanaan Angkutan Laut
Depositing User: Mr Agus Wahyudi
Date Deposited: 04 Feb 2019 09:16
Last Modified: 04 Feb 2019 09:16
URI: http://repository.pip-semarang.ac.id/id/eprint/878

Actions (login required)

View Item View Item