MUHAMMAD, RIZKY BIMANTORO (2018) Optimalisasi Pengoperasian Reliquefaction Plant untuk Menangani Permasalahan dalam Proses Pemuatan Gas LPG di Kapal MT. Gas Komodo. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text (DAFTAR RIWAYAT HIDUP)
15. DAFTAR DIWAYAT HIDUP RIZKY.pdf Download (4MB) | Preview |
|
|
Text (BAB 1)
BAB I.pdf Download (4MB) | Preview |
|
Text (BAB 3)
BAB III.pdf Restricted to Registered users only Download (4MB) | Request a copy |
||
|
Text (BAB 2)
BAB II.pdf Download (4MB) | Preview |
|
|
Text (BAB 5)
BAB V.pdf Download (4MB) | Preview |
|
|
Text
Cargo tank piping diagram.pdf Download (4MB) | Preview |
|
|
Text
letter of protes.pdf Download (4MB) | Preview |
|
|
Text
Note of protest (temperatur).pdf Download (4MB) | Preview |
|
Text (BAB 4)
BAB IV.pdf Restricted to Registered users only Download (4MB) | Request a copy |
||
|
Text
SHIP PARTICULLARS.pdf Download (4MB) | Preview |
|
|
Text
1- HALAMAN JUDUL.pdf Download (4MB) | Preview |
|
|
Text
2. Halaman Pengesahan.pdf Download (4MB) | Preview |
|
|
Text
5. HALAMAN MOTTO.pdf Download (4MB) | Preview |
|
|
Text
4. Halaman Pernyataan.pdf Download (4MB) | Preview |
|
|
Text
6. PERSEMBAHAN.pdf Download (4MB) | Preview |
|
|
Text
3. Halaman Persetujuan.pdf Download (4MB) | Preview |
|
|
Text
7. Kata pengantar.pdf Download (4MB) | Preview |
|
|
Text
8. DAFTAR ISI.pdf Download (4MB) | Preview |
|
|
Text
14. Daftar Wawancara.pdf Download (4MB) | Preview |
|
|
Text
13. Daftar Lampiran.pdf Download (4MB) | Preview |
|
|
Text
9. Daftar Pustaka.pdf Download (4MB) | Preview |
|
|
Text
12. Daftar Gambar.pdf Download (4MB) | Preview |
|
|
Text
1- HALAMAN JUDUL DEPAN.pdf Download (4MB) | Preview |
|
|
Text
Pembatas.pdf Download (4MB) | Preview |
|
|
Text (ABSTRACT)
11. ABSTRACTION.pdf Download (4MB) | Preview |
|
|
Text (ABSTRAK)
10. ABSTRAKSI.pdf Download (4MB) | Preview |
Abstract
Muhammad Rizky Bimantoro, 2018, NIT: 50134787 N, "Optimization of Reliquefaction Plant Operation to Address Problems in the LPG Gas Process on MT Komodo Gas Ship", Diploma IV, Nautika, Polytechnic of Semarang Sailing Scout, Supervisor I: Dodik Widarbowo, MT, M.Mar and Supervisor II: Ir . Fitri Kensiwi, M.Pd The transport of LPG on a fully refrigerated LPG vessel requires special attention to the problem that is often experienced by high tank pressure. In operation the charge of fully refrigerated cargo handling of the temperature and pressure on the load tank is very important, because the factors that cause the loading delay is due to the existence of very high tank pressure, and not optimal Reliquefaction Plant to reduce pressure on the load tank, so it is necessary to know how the handling temperature and the pressure on the loading tank in its loading and the constraints that affect it and the effort in overcoming the constraints. As for the literature review as supporting the writing of thesis that the LPG charge at outside air pressure will evaporate at very low temperature that is - 42.30C for propane and -0.50C for butane. Then the temperature and pressure on the load tank must remain in a stable state in keeping the charge in liquid form. In writing this thesis the author uses descriptive method, qualitative, and data collection by observation by observing directly the object of research, conducting interviews with a number of respondents and supported by the method of documentation. Based on the result of research that in handling less than optimal Operation of Reliquefaction Plant at the time of LPG loading process. The obstacles are limited power generator, lack of coordination between the ship and the pertamina operation and high load temperature. As a result the loading time will be longer. So the effort to overcome them is to immediately communicate with pertamina operation and operate the ballast pump before loading to reliquefaction plant operate 4 sets and reduce the loading rate. In the end results of research on Optimization of Reliquefaction Plant Operation to Handle Problems in LPG Gas Loading Process in MT Ship. Gas Komodo is very important to be done on board for the creation of an objective (facilitating the implementation of fully refrigerated LPG loading) and can be accounted for and can be taken a conclusion or as an evaluation for reference Key word: LPG fully refrigerated, delays of loading process, temperature and pressure of cargo tanks, loading operation.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | LPG fully refrigerated, delays of loading process, temperature and pressure of cargo tanks, loading operation. |
Subjects: | Skripsi Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 01 Feb 2019 02:38 |
Last Modified: | 01 Feb 2019 02:38 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/731 |
Actions (login required)
View Item |