UMROTUN, NAFSIYAH (2017) PERAN BARGE SCHEDULES DALAM MENGURANGI DELAY TIME PADA PT. INDEXIM COALINDO. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
Text
14. Bab III.pdf Restricted to Registered users only Download (4MB) | Request a copy |
||
Text
15. .BAB IV.pdf Restricted to Registered users only Download (5MB) | Request a copy |
||
|
Text
16.BAB V.pdf Download (4MB) | Preview |
|
|
Text
17. DAFTAR PUSTAKA.pdf Download (4MB) | Preview |
|
|
Text
18.KERTAS PEMBATAS.pdf Download (39kB) | Preview |
|
|
Text
20. Draft Laytime Calculation MV Fermita.pdf Download (4MB) | Preview |
|
|
Text
1. JUDUL.pdf Download (191kB) | Preview |
|
|
Text
4. HALAMAN PERNYATAAN.pdf Download (4MB) | Preview |
|
|
Text
2.HALAMAN PERSETUJUAN.pdf Download (4MB) | Preview |
|
|
Text
21. CV.pdf Download (4MB) | Preview |
|
|
Text
3.HALAMAN PENGESAHAN.pdf Download (4MB) | Preview |
|
|
Text
19. Debit Note CNBM - MV. FERMITA.pdf Download (4MB) | Preview |
|
|
Text
5. MOTTO.pdf Download (4MB) | Preview |
|
|
Text
6. HALAMAN PERSEMBAHAN.pdf Download (4MB) | Preview |
|
|
Text
7. KATA PENGANTAR.pdf Download (4MB) | Preview |
|
|
Text
9. DAFTARGAMBAR.pdf Download (4MB) | Preview |
|
|
Text
8. DAFTAR ISI.pdf Download (4MB) | Preview |
|
|
Text
10. DAFTAR LAMPIRAN.pdf Download (4MB) | Preview |
|
|
Text
11. ABSTRAK.pdf Download (5MB) | Preview |
|
|
Text
12.BAB I.pdf Download (4MB) | Preview |
|
|
Text
13.BAB II.pdf Download (4MB) | Preview |
Abstract
Umrotun Nafsiyah, 2017, 49124705 K " The Role of Barge Schedule to reduce Delay Time in PT. Indexim Coalindo", mini thesys of Port and Shipping Department, Diploma IV Programmed, Semarang Merchant Marine Polytechnic, Advisor (I) : Dr. Winarno, S.S.T, M.H., Advisor (II) : Achmad Wahyudiono, MM. Delay time is one of factor which cause a company get loss. instead of time tha supposed to be used for charging and discharging process or productive time became unproductive time or there is no activity. A company must be minimize that factor or even eliminated or nothing at all. This things performed in order to make company not bear demurrage caused of delays that happen while charging and discharging process. In this case, researcher use descriptive qualitative writing method to describe object which observed. Researcher involved in searching data process by observing and analyzing fact and characteristic of object and subject which observed directly. This method purpose to get description comprehensively and clearly about the role of barge schedule to reduce delay time in PT. Indexim Coalindo. Submitting data that used in this research is primary and secondary data. Besides that, this research also use observation, interview, and literature study. Researcher use direct and indirect observation. From the result of this research which doing by researcher that factor which stunted delay time is malfunction of charging discharging equipment which located in hopper and reclaimer, thich dust which produced by coal, coal not appropriate with criteria. To solve that obstacle doing some efforts by company which are repairmen and maintenance charging discharging equipment continuously, giving chemical liquid, streamline trucking flow from mining to stockpile and doing blending process. Keyword: barge schedules, delay time, PT. Indexim Coalindo
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | barge schedules, delay time, PT. Indexim Coalindo |
Subjects: | Skripsi > TALK |
Divisions: | TALK |
Depositing User: | Admin Admin Admin |
Date Deposited: | 27 Jan 2019 09:01 |
Last Modified: | 06 Feb 2019 01:28 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/290 |
Actions (login required)
View Item |