MANAJEMEN PERAWATAN DAN PERBAIKAN ALAT BONGKAR MUAT DI KAPAL MV. KEOYANG NOBLE

ADI, BANGGA SAPUTRA (2017) MANAJEMEN PERAWATAN DAN PERBAIKAN ALAT BONGKAR MUAT DI KAPAL MV. KEOYANG NOBLE. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img]
Preview
Text
6. Halaman Persembahan.pdf

Download (703kB) | Preview
[img]
Preview
Text
7. Kata Pengantar.pdf

Download (704kB) | Preview
[img]
Preview
Text
8. Daftar isi.pdf

Download (725kB) | Preview
[img]
Preview
Text
9. Abstraksi.pdf

Download (569kB) | Preview
[img]
Preview
Text
10. Bab 2.pdf

Download (686kB) | Preview
[img]
Preview
Text
10. Bab 1.pdf

Download (610kB) | Preview
[img]
Preview
Text
10. Bab 5.pdf

Download (598kB) | Preview
[img]
Preview
Text
13. Daftar lampiran.pdf

Download (590kB) | Preview
[img]
Preview
Text
12. Riwayat Hidup.pdf

Download (574kB) | Preview
[img]
Preview
Text
11. Daftar Pustaka(Progress).pdf

Download (458kB) | Preview
[img]
Preview
Text
Crane Monthly Inspection Record.pdf

Download (948kB) | Preview
[img] Text
10. Bab 4.pdf
Restricted to Registered users only

Download (2MB)
[img] Text
10. Bab 3.pdf
Restricted to Registered users only

Download (748kB)
[img] Text
Lampiran 4.1.pdf

Download (1MB)
[img]
Preview
Text
Lampiran 4.2.pdf

Download (799kB) | Preview
[img]
Preview
Text
Lampiran 4.3.pdf

Download (162kB) | Preview
[img]
Preview
Text
1. Halaman judul.pdf

Download (76kB) | Preview
[img]
Preview
Text
2. Halaman persetujuan.pdf

Download (634kB) | Preview
[img]
Preview
Text
3. Halaman pengesahan.pdf

Download (628kB) | Preview
[img]
Preview
Text
4. Halaman pernyataan.pdf

Download (616kB) | Preview
[img]
Preview
Text
5. Motto.pdf

Download (603kB) | Preview
[img]
Preview
Text
Lampiran 4.2.pdf

Download (799kB) | Preview

Abstract

Adi Bangga Saputra, 2017, NIT: 50134740.N, “Maintenance and Upgrade Management of loading and unloading Equipment on MV Ships. Keoyang Noble”, Diploma IV, Nautical, Semarang Merchant Marine Polytechnic, First guide: Capt. Samsul Huda, MM, M.Mar., Second guide: Ir.Fitri Kensiwi, M.Pd. Loading and unloading activities must run on time in accordance with the predicted schedule, then in carrying out the loading and unloading equipment is one important factor for the loading process to run smoothly. Based on these facts the authors are interested to make a thesis with the title "Management Maintenance and Repairing Tools Loading on ships MV. Keoyang Noble ". Problems that the author lift that is: the management of maintenance and repair of loading and unloading equipment on the ship MV. Keoyang Noble, how the Standard Operating Procedure, whether there are differences and constraints of both, and what efforts are made to overcome them. If in such a difference becomes a problem then the need for evaluation that must be followed up. And if there are any obstacles or constraints it must be sought solutions to overcome these problems. In this thesis, the research method used is the method of USG (Urgency Seriousness, and Growth) which is observative by observing the existing activities and methods of interviews are conducting interviews directly to the crew on the loading and unloading equipment as well as maintenance. Based on the analysis that has been done, that the management of loading and unloading equipment on the ship implement preventive maintenance and maintenance breakdown, while the Standard Operating Procedure implementation such as Manual Instruction Book is periodic maintenance. Obstacles experienced in this implementation is the insecurity that still happens. So researchers try to make efforts in overcoming these obstacles and make some efforts related to maintenance management and repair of loading and unloading tools. From the results of the analysis, it can be concluded that the management of maintenance and repair of loading and unloading equipment needs to be planned. The planned care method is carried out properly and regularly in accordance with the programmed schedule, so that damage to the loading and unloading equipment can be avoided and the loading and unloading equipment is ready for use. Keywords: Standard Operating Procedure, Manual Instruction Book, Preventive Maintenance, Breakdown Maintenance, Ultrasound.

Item Type: Thesis (Diploma)
Subjects: Skripsi
Skripsi > Nautika
Divisions: Nautika
Depositing User: Users 4 not found.
Date Deposited: 25 Jan 2019 06:20
Last Modified: 25 Jan 2019 06:20
URI: http://repository.pip-semarang.ac.id/id/eprint/184

Actions (login required)

View Item View Item