GALUH, RADITINIAR S P (2019) PELAKSANAAN BONGKAR MUAT PETI KEMAS MENGGUNAKAN CRANE KAPAL PADA KM. ORIENTAL SILVER. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
Pdf (51145117N_SKRIPSI_FULLTEXT)
51145117N_Skripsi_Fulltext.pdf Restricted to Repository staff only Download (5MB) | Request a copy |
||
|
Pdf (51145117N_SKRIPSI_OPEN_ACCESS)
51145117N_Open _Access.pdf Download (3MB) | Preview |
Abstract
ABSTRAK Galuh Raditiniar Soetikno Putra, 2019, NIT: 51145117N, “Pelaksanaan BongkarMuat Peti Kemas Menggunakan Crane Kapal Pada MV. ORIENTAL SILVER”,Sripsi Program D IV, Politeknik Ilmu Pelayaran Semarang, pembimbing (1) Capt. H. S. SUMARDI, S,H., M.M., M.Mar (2) Dr. WINARNO, S.ST., M.H Perkembangan transportasi laut dewasa ini begitu pesat seiring perkembangan zaman. Di bidang transportasi laut khususnya pengangkutan barang atau muatan, telah terjadi perubahan dan peningkatan, yaitu dengan hadirnya peti kemas (Container) yang menjadi suatu sistem baru. Namun dalam pelaksanaan bongkar muat peti kemas menggunakan crane kapal sering muncul hambatan yang berakibat lambatnya kegiatan tersebut. Adapun tujuan yang hendak dicapai dari hasil penelitian yang dilakukan peneliti adalah untuk mengetahui hambatan – hambatan apa saja yang sering dihadapi dalam proses bongkar muat peti kemas dan meningkatkan kinerja dalam suatu proses bongkar muat tersebut guna menghindari keterlambatan. Metode penelitian yang dilakukan penulis untuk membahas masalah yaitu metode penelitian kualitatif.Penelitian kualitatif adalah penelitian tentang riset yang bersifat deskriptif dan cenderung menggunakan analisis dengan pendekatan induktif. Proses dan makna (perspektif subyek) lebih ditonjolkan dalam penelitian kualitatif. Pengumpulan data yang dilakukan oleh penulis berdasar pengalaman di atas kapal dengan cara Observasi (pengamatan), teknik analisis data, serta metode kepustakaan. Penelitian tentang bongkar muat peti kemas menggunakan crane kapal, faktor-faktor yang mempengaruhi kecepatan bongkar muat dikapal kurang diperhatikan seperti dan penentuan cara atau metode pelaksanaan bongkar muat yang kurang tepat disebabkan oleh pembagian tugas kegiatan operasional para pekerja belum terlaksana dengan benar dan perawatan peralatan bongkar muat yang kurang optimal, sehingga kegiatan bongkar muat menjadi terhambat dan memakan waktu yang lama. Untuk mencegah hal tersebut hendaknya memperhatikan faktor-fakor yang mempengaruhi kecepatan bongkar muat menggunakan crane kapal dengan benar dan melaksanakan metode atau cara yang tepat dalam kegiatan bongkar muat, sehingga perlu adanya pemberian keterampilan, pemahaman dan pengetahuan para pekerja dalam pelaksanaan kegiatan tersebut, membagi tugas operasional kegiatan pada para pekerja serta menambah peralatan yang memadai, dan merawat peralatan bongkar muat secara optimal, agar kegiatan bongkar muat dapat berjalan dengan lancar, cepat dan effisien. ABSTRACT Galuh Raditiniar Soetikno Putra, 2019, NIT: 51145117 N, “Research About Unloading The Container Using The Vessel’s Crane At MV. ORIENTAL SILVER”Nautical Department, Semarang Merchant Marine Politechnic (1) Capt. H. S. SUMARDI, S,H., M.M., M.Mar (2) Dr. WINARNO, S.ST., M.H The progress of Indonesian transportation now days is grow really fast following the era. Especially transportation on the sea that involve transporting cargo or other load, it has change and grow, with presence of Container, a new technology to pack the loads. But when unload the Container with the vessel’s crane usually trouble appear and delaying the process of unloading. And the purpose researcher from doing all this research is to find out all the troubles that appear when unloading the container and increase the quality of unloading itself by avoiding the troubles that delay the unloading process. The researcher use qualitative as the method to finish this research.Qualitative was a method that have character to descriptive and mostly use inductive approach. Process and meaning (perspective subject) shown more stand out by the qualitative method. The data was collected by experience of the researcher himself on the vessel by doing observation, analysis data technic, and also literature method. Research about unloading the Container using the vessel’s crane, the factors that affect the speed of unloading the vesselis ignored and the way or method to unload the Container is not right caused by the job division is not divided rightly and the treatment to the unloading gear was not that optimal, so the unloading process take too much time. To prevent those troubles we have to pay attention to the factors that affect the speed of unloading process correctly and doing the right method when doing the Loading process, so training was needed, knowledge and comprehension of the worker when they do their job, divide the jobs to the workers correctly and increasing the number of the needed gear, and treat the unloading gears optimally, so the unloading process will run smooth, fast and save.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Key Word: Loading Discharge, container, and The Vessel’s Crane Kata Kunci : Bongkar muat, petikemas, crane kapal |
Subjects: | Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 16 Sep 2019 06:58 |
Last Modified: | 16 Sep 2019 06:58 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/1633 |
Actions (login required)
View Item |