ACHMAD, ASY’ARI (2018) ANALISIS KETERLAMBATAN SUPPLY SPARE PART YANG MENGGANGGU MANAJEMEN PERAWATAN KAPAL MT. ENDURO DI PT. PERTAMINA PERKAPALAN JAKARTA. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
Text (ABSTRAK)
11. Abstrak.pdf Download (511kB) |
||
|
Text
9. Daftar Gambar.pdf Download (325kB) | Preview |
|
Text (DAFTAR TABEL)
10. Daftar Tabel.pdf Download (423kB) |
||
|
Text (ABSTRACT)
12. Abstract.pdf Download (511kB) | Preview |
|
|
Text (DAFTAR ISI)
8. Daftar isi.pdf Download (493kB) | Preview |
|
|
Text (BAB 1)
13-BAB I.pdf Download (333kB) | Preview |
|
|
Text (BAB 2)
14-BAB II..pdf Download (633kB) | Preview |
|
Text (BAB 3)
15-BAB III ..pdf Restricted to Registered users only Download (501kB) | Request a copy |
||
|
Text
18-Daftar Pustaka.pdf Download (186kB) | Preview |
|
Text (BAB 4)
16-BAB IV ..pdf Restricted to Registered users only Download (895kB) | Request a copy |
||
|
Text (LAMPIRAN)
19-Lampiran.pdf Download (1MB) | Preview |
|
|
Text (BAB 5)
17-BAB V..pdf Download (331kB) | Preview |
|
|
Text (RIWAYAT HIDUP)
20-Riwayat hidup.pdf Download (299kB) | Preview |
|
|
Text (HAL JUDUL)
1. Halaman judul.pdf Download (460kB) | Preview |
|
|
Text (HAL PERSETUJUAN)
2. Hal Persetujuan.pdf Download (268kB) | Preview |
|
|
Text (MOTTO)
5. Motto.pdf Download (197kB) | Preview |
|
|
Text (HAL PERNYATAAN)
4. Hal Pernyataan.pdf Download (270kB) | Preview |
|
|
Text (HAL PENGESAHAN)
3. Hal Pengesahan.pdf Download (286kB) | Preview |
|
|
Text (KATA PENGANTAR)
7. Kata pengantar.pdf Download (575kB) | Preview |
Abstract
Achmad Asy’ari, NIT: 51145490. K, 2018, "Analysis of delay in supply spare part that disrupt the maintanance management of MT. Enduro vessel at PT. Pertamina Perkapalan Jakarta", Diploma IV, Port and Shipping study management, Merchant Marine Polytechnic Semarang, Supervisor I: Ir. Fitri Kensiwi, M.Pd and Supervisor II: Capt. Arika Palapa, M. Si., M.Mar. Ship spare parts is supporting machinery elements in operation to functiion properly. So that it’s hoped that supporting spare part on board can affect the demage that will occur. This makes an important role in the process of precurement of goods/services and the process of supply spare part on the ship to run smoothly. But the reality is in the field, the process has problems because in the process procurement of goods/services spare part it’s difficult, ship route deviations often occur. PMS (plan maintanane system) routines don’t work well. So that that this relatively long proccess causes delays in delivery. The study was carried out on the delay in the supply spare part on the MT. Enduro vessel, one of the fleet ships owned by PT. Pertamina. Data sources used in the preparation of this thesis include primary data obtained directly from the research, and secondary data obtained from documents relating to the thesis title. Data sources obtained directly are participation, observation, interviews, literature studies related to this study. While the type of method that researchers use is a SWOT analysis, which aims to determine the most influential factor in the cause of delays in supply spare part. After doing research using SWOT method, it’s known that the causes of ship spare parts delays are due to the procurement process of goods/services and ship route deviations often occur. Countermeasures for this delay are by providing spare part and contacting the machining expert technicians closset to the port. The strategy that’s carried out is by using the auction system to the vendors and the direct pointing method for the procurement of goods/ services. Keywords: Spare part, Route deviations, Analysis SWOT
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Spare part, Route deviations, Analysis SWOT |
Subjects: | Skripsi Skripsi > TALK |
Divisions: | TALK |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 01 Feb 2019 08:21 |
Last Modified: | 06 Feb 2019 03:31 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/761 |
Actions (login required)
View Item |