PENINGKATAN PERAWATAN PELAKSANAAN PROSES BONGKAR MUAT DI MV. BARA ANUGERAH

BAYU, ADI SULISTYO (2018) PENINGKATAN PERAWATAN PELAKSANAAN PROSES BONGKAR MUAT DI MV. BARA ANUGERAH. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img]
Preview
Text
8. Kata Pengantar (vii-viii).pdf

Download (4MB) | Preview
[img]
Preview
Text
7. Halaman Persembahan (vi).pdf

Download (4MB) | Preview
[img]
Preview
Text
9. Daftar Isi (ix-x).pdf

Download (4MB) | Preview
[img]
Preview
Text
10. Daftar Gambar (xi).pdf

Download (4MB) | Preview
[img]
Preview
Text
11. Daftar Tabel (xii).pdf

Download (4MB) | Preview
[img]
Preview
Text
12. Daftar Lampiran (xiii).pdf

Download (4MB) | Preview
[img]
Preview
Text
13. Abstraksi (xiv).pdf

Download (4MB) | Preview
[img]
Preview
Text
14. Abstract (xv).pdf

Download (4MB) | Preview
[img]
Preview
Text
15. BAB I Bayu.pdf

Download (4MB) | Preview
[img]
Preview
Text
16. BAB II Bayu.pdf

Download (4MB) | Preview
[img] Text
17. BAB III Bayu.pdf
Restricted to Registered users only

Download (4MB) | Request a copy
[img] Text
18. BAB IV Bayu.pdf
Restricted to Registered users only

Download (4MB) | Request a copy
[img]
Preview
Text (Daftar Pustaka)
20. Daftar Pustaka.pdf

Download (4MB) | Preview
[img]
Preview
Text
19. BAB V bayu.pdf

Download (4MB) | Preview
[img]
Preview
Text
21. Lembar wawancara.pdf

Download (4MB) | Preview
[img]
Preview
Text
22. Ship Particular MV.Bara Anugerah.pdf

Download (4MB) | Preview
[img]
Preview
Text
23. Crew List MV. Bara Anugerah.pdf

Download (4MB) | Preview
[img]
Preview
Text
24. Monthly Maintenance Plan May 2016.pdf

Download (4MB) | Preview
[img]
Preview
Text
25. Wire rope renewal history March 2015.pdf

Download (4MB) | Preview
[img]
Preview
Text
26. Wire Rope Running Hours Sept 2016.pdf

Download (4MB) | Preview
[img]
Preview
Text
27. Laporan Kerusakan kapal.pdf

Download (4MB) | Preview
[img]
Preview
Text
28. Crane Running Hours & GE RH 19-10-2014.pdf

Download (4MB) | Preview
[img]
Preview
Text
29. Store Requisition.pdf

Download (4MB) | Preview
[img]
Preview
Text
30. Lembar Konsultasi Dosen I.pdf

Download (7MB) | Preview
[img]
Preview
Text
31. Lembar Konsultasi Dosen II.pdf

Download (8MB) | Preview
[img]
Preview
Text
32. Daftar Riwayat Hidup.pdf

Download (4MB) | Preview
[img]
Preview
Text
1. Halaman Cover Depan.pdf

Download (4MB) | Preview
[img]
Preview
Text
2. Halaman Judul (i).pdf

Download (4MB) | Preview
[img]
Preview
Text
3. Halaman Persetujuan (ii).pdf

Download (5MB) | Preview
[img]
Preview
Text
4. Halaman Pengesahan (iii).pdf

Download (4MB) | Preview
[img]
Preview
Text
6. Halaman Motto (v).pdf

Download (4MB) | Preview
[img]
Preview
Text
5. Halaman Pernyataan (iv).pdf

Download (4MB) | Preview
Official URL: http://www.library.pip-semarang.ac.id

Abstract

ABSTRACT Bayu Adi Sulistyo, 2018, NIT : 50134774.N, “Improvement of Ship's Crane Maintenance to Smooth Loading and Unloading Process in MV.Bara Anugerah”, thesis of nautical study program, diploma program IV, Merchant Marine Polytechnic of Semarang, First Mentor : Capt. I Kadek Laju, S.H,. M.M,.M.Mar, Second Mentor : R.A.J Susilo Hadi Wibowo, S.IP,. M.M. Ship’s crane is a loading and unloading tool normally located in parts the middle of the ship that serves to lift the cargo from the hatch later on the move to the dock. The arm of the crane of the ship must be long enough, so it can move from hold to dock. The system used on the craneship using a steel cable mechanism (wire rope) that enters through the hoist loaded that is driven by an electric motor. Based on the results of research, the authors are interested to make a thesis with title "Improved Care of Ship's Crane to Smooth Process Unloading Load in MV. Bara Anugerah ". In carrying out the loading and unloading tools there are 2 problems faced is how the effect of ship's crane treatment to the smooth process of loading and unloading and what efforts are done to improve ship's crane maintenance for smooth unloading process load. In this study, the method used using USG method (Urgency, Seriousness, Growth) which is a method that uses methods of collecting and drawing data using observation techniques, interviews, and documentation, while the discussion of this thesis use qualitative descriptive analysis techniques. Based on the analysis that ship’s crane loading and unloading equipment cannot be carried out regularly resulting in damage on the wire crane which of course the loading or unloading process be late or disturbed. This is due to delayed delivery sparepart so the crew work is not sufficient to support the implementation maintenance of loading and unloading tools. From the results of the research can be concluded that the treatment of ship's crane very influential to the smooth process of loading and unloading for example is on wire crane, the loading and unloading equipment must be carried out properly and regularly according to schedule and procedure. Efforts made to improve ship's crane maintenance by providing guidance to the ship's crew regarding proper treatment in accordance with the procedure. Keywords: Ship's crane, loading and unloading process, improvement

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Ship's crane, loading and unloading process, improvement
Subjects: Skripsi
Skripsi > Nautika
Divisions: Nautika
Depositing User: Unnamed user with email dannupurwanto07@gmail.com
Date Deposited: 30 Jan 2019 16:22
Last Modified: 06 Feb 2019 02:03
URI: http://repository.pip-semarang.ac.id/id/eprint/640

Actions (login required)

View Item View Item