PENANGANAN BONGKAR MUAT PETI KEMAS DENGAN BANTUAN KAPAL CRANE BARGE DI PELABUHAN ALTERNATIF GUNUNG TABUR KALIMANTAN TIMUR

AZMI, ARNOPAL (2017) PENANGANAN BONGKAR MUAT PETI KEMAS DENGAN BANTUAN KAPAL CRANE BARGE DI PELABUHAN ALTERNATIF GUNUNG TABUR KALIMANTAN TIMUR. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img] Text (BAB 4)
BAB 4.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img]
Preview
Text (BAB 5)
BAB 5.pdf

Download (2MB) | Preview
[img]
Preview
Text (COVER)
COVER.pdf

Download (3MB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
daftar pustaka.pdf

Download (566kB) | Preview
[img] Text (BAB 3)
BAB 3.pdf
Restricted to Registered users only

Download (723kB) | Request a copy
[img]
Preview
Text (LAMPIRAN)
lampiran.pdf

Download (2MB) | Preview
[img]
Preview
Text (BAB 2)
BAB 2.pdf

Download (718kB) | Preview
[img]
Preview
Text (BAB 1)
BAB 1.pdf

Download (672kB) | Preview
Official URL: http://www.library.pip-semarang.ac.id

Abstract

Azmi Arnopal, 2017, NIT : 48113947. N, “Cargo handling of container with help of a Crane Barge Ship in the alternative port of Gunung Tabur East Kalimantan”, Diploma IV Program, Nautical, Merchant Marine Polythecnic Semarang, 1st Adviser: Capt. ALI IMRAN RITONGA, M.M., M.Mar, 2nd Adviser : DARYANTO S.H., M.M. The process of loading and unloading containers at general port of container using gantry crane so make that the process is done quickly and efficiently. The process of loading and unloading containers on MV. Pekan Riau at the alternative port of Gunung Tabur East Kalimantan use Crane Barge Ship Tarakan Raya takes along time because the process using crane. The purpose of this research is to find out how is the procedure of loading and unloading carried out. This is a descriptive qualitative research with describing detailed about the process of loading and unloading of containers at the alternative port of Gunung Tabur using crane and the process is done in stages in each bay. When there is damage with the loading and unloading equipment, the process of loading and unloading will be stopped and for the implementation of loading and unloading will be different stages. The process of loading and unloading at the alternative port of Gunung Tabur is only done when the crane barge ship did not grounded because the water of Berau river was receding. Based on the results of this study concluded that the process of loading and unloading containers at the alternative port of Gunung Babur East Kalimantan use crane barge ship is not efficient because the process is done using a crane of vessel so make that the time for the process occurs in a very long time. If there is damage with the loading and unloading equipment, especially on the crane of ship and when the crane barge ship have grounded because the water of river was receding, time to complete the process of loading and unloading will be longer than before. From the above conclusion that the process of loading and unloading containers in ports should not use the crane of vessel but use the gantry crane for the time loading and unloading process can be resolved quickly Keywords: container, loading and unloading, alternative port

Item Type: Thesis (Diploma)
Uncontrolled Keywords: container, loading and unloading, alternative port
Subjects: Skripsi > Nautika
Divisions: Nautika
Depositing User: Mr Agus Wahyudi
Date Deposited: 30 Jan 2019 06:25
Last Modified: 06 Feb 2019 02:46
URI: http://repository.pip-semarang.ac.id/id/eprint/598

Actions (login required)

View Item View Item