REZKI, RAMADHAN (2017) UPAYA MENCEGAH TERHAMBATNYA KEGIATAN BONGKAR MUAT BATU BARA PADA MV. DK 0. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text
BAB II rezki fix.pdf Download (4MB) | Preview |
|
Text
bab III usg fix rezki.pdf Restricted to Registered users only Download (4MB) | Request a copy |
||
|
Text
BAB V fix rezki.pdf Download (4MB) | Preview |
|
|
Text
DAFTAR PERTANYAAN WAWANCARA baru.pdf Download (4MB) | Preview |
|
|
Text
02. HALAMAN PERSETUJUAN.pdf Download (4MB) | Preview |
|
|
Text
03. HALAMAN PENGESAHAN.pdf Download (4MB) | Preview |
|
|
Text
05. MOTTO HIDUP.pdf Download (4MB) | Preview |
|
Text
BAB IV fix rezki.pdf Restricted to Registered users only Download (5MB) | Request a copy |
||
|
Text
Daftar Lampiran.pdf Download (4MB) | Preview |
|
|
Text
06. HALAMAN PERSEMBAHAN.pdf Download (4MB) | Preview |
|
|
Text
07. KATA PENGANTAR.pdf Download (4MB) | Preview |
|
|
Text
04. HALAMAN PERNYATAAN.pdf Download (4MB) | Preview |
|
|
Text
08. DAFTAR ISI.pdf Download (4MB) | Preview |
|
|
Text
09. ABSTRAKSI.pdf Download (4MB) | Preview |
|
|
Text
10. ABSTRAKSI BAHASA INGRRIS.pdf Download (4MB) | Preview |
|
|
Text
01. SAMPUL.pdf Download (74kB) | Preview |
|
|
Text
BAB I fix rezki.pdf Download (4MB) | Preview |
|
|
Text
17. RIWAYAT HIDUP.pdf Download (4MB) | Preview |
|
|
Text
16. DAFTAR PUSTAKA.pdf Download (4MB) | Preview |
Abstract
Rezki Ramadhan, Efforts to Prevent Delay of Coal Unloading Activities on MV Board. DK 01. Thesis, Politeknik Ilmu Pelayaran Semarang Supervisors : ( I ) Capt. Suherman, M.Mar ( II ) Sri Murdiwati, S. Sos, M.Si At this time in the implementation of loading and unloading of the load often arise a problem, so often hampered in dismantling and loading. In this thesis, the author tries to discuss the existing problem, “The effort to prevent hampered coal loading and unloading activities in MV. DK 01”. Why the loading and unloading activities of coal is hampered and how to prevent stunt loading activities. In the theoretical basic there are several points about material related with the title of this thesis. Among them about the meaning of loading and unloading tools and loading equipments. To improve the meaning of knowledge of crew that is useful for better maintain the loading and unloading tools which on the board. In this thesis the author use a USG methodology as a research procedure that produces descriptive observation in the form of written words from people and behavior tha can be observed. The purpose of this study is to provide a systematic description of a real situation in preventing stagnation of coal loading and unloading activities on MV.DK 01. During the research, the author got finding among others in the loading an unloading activities that is how to prevent stunted loading and unloading activities of coal in MV.DK 01, the obstacles faced is the lack of maintenance of loading and unloading equipment which is the responsibility of the crew and the number of elderly worker who should have been disable and replaced with a younger and profesional workforce for the process of loading and unloading more leverage. From the result of research and discussion of the above problems can be concluded that in the loading an unloading, and required a younger and profesional workforce. The suggestion from the author is should be performed intensive loading and unloading equipment, always give direction to the workforce before starting his work, and always do more supervision to all workforce Keywords : equipment maintenance, workforce.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | equipment maintenance, workforce |
Subjects: | Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Admin Admin Admin |
Date Deposited: | 25 Jan 2019 08:20 |
Last Modified: | 06 Feb 2019 01:11 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/241 |
Actions (login required)
View Item |