UPAYA PENCEGAHAN KETERLAMBATAN PROSES LOADING LPG DIKAPAL MT. GAS NURI ARIZONA

NUR, AJI ROHMAN (2019) UPAYA PENCEGAHAN KETERLAMBATAN PROSES LOADING LPG DIKAPAL MT. GAS NURI ARIZONA. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img] Pdf (52155663N_SKRIPSI_FULLTEXT)
52155663N_Skripsi_Fulltext.pdf
Restricted to Repository staff only

Download (4MB) | Request a copy
[img] Pdf (52155663N_SKRIPSI_OPEN_ACCESS)
52155663N_Open_Access.pdf

Download (3MB)
Official URL: http://www.library.pip-semarang.ac.id

Abstract

ABSTRAKSI Nur Aji Rohman, 2019, NIT: 52155663N, “Upaya Pencegahan Keterlambatan Proses Loading LPG Dikapal MT. Gas Nuri Arizona”. Program Studi Nautika, Program Diploma IV, Politeknik Ilmu Pelayaran Semarang, Pembimbing I: Capt. Ali Imran Ritonga, M.M., M.Mar. and Pembimbing II: Sarifuddin, M.Pd, M.Mar.E LPG Carrier adalah jenis kapal niaga yang mengangkut muatan gas yang dicairkan. Setiap kapal gas memiliki karakteristik yang berbeda baik dalam penanganan muatan maupun sistem pengangkutanya. Kapal MT. Gas Nuri Arizona adalah kapal gas dengan tipe fully Pressurerized yang dirancang untuk mengangkut LPG dan gas cair lain dalam jumlah besar. Tujuan peneliti melakukan penelitian ini yaitu untuk mengetahui hambatan yang ditimbulkan ketika proses pemuatan dan upaya untuk pencegahannya. Dari hasil penelitian yang dilakukan selama praktek berlayar di MT. Gas Nuri Arizona mengenai upaya pencegahan keterlambatan proses loading LPG, hambatan yang terjadi saat proses pemuatan adalah pelaksanaan prosedur pemuatan yang tidak baik, panasnya muatan dari kapal yang memberi muatan (mother ship) dan kurang optimalnya kinerja cargo compressor. Maka upaya untuk mengatasinya adalah melaksanakan pemuatan sesuai prosedur, mensyaratkan bagi anak buah kapal untuk mempunyai sertifikat basic liquified for gas tanker, melakukan koordinasi dengan perwira jaga dari kapal pemberi muatan, dan melaksanakan perawatan alat-alat bongkar muat sesuai plan maitenace system. Penelitian ini menggunakan metode deskriptif kualitatif, serta pengumpulan data secara observasi dengan cara mengamati langsung objek penelitian, melakukan wawancara dengan sejumlah responden dan didukung dengan metode dokumentasi. Dari hasil penelitian diatas dapat disimpulkan bahwa proses pemuatan LPG di LPG/C Gas Nuri Arizona dapat berjalan lancar apabila proses pemuatan dilaksanakan sesuai prosedur, melakukan koordinasi dan komunikasi yang baik saat proses pemuatan dan alat pemuatan dalam kondisi bagus. ABSTRACT Nur Aji Rohman, 2019, NIT: 52155663N, “Upaya Pencegahan Keterlambatan Proses Loading LPG Dikapal MT. Gas Nuri Arizona”. Nautical Departmen, Diploma IV Program, Semarang Merchant Marine Polytechnics, 1st Supervisor : Capt. Ali Imran Ritonga, M.M., M.Mar. and 2nd Supervisor : Sarifuddin, M.Pd, M.Mar.E LPG Carrier is one of the vessels which carries gas that is being liquefied. Every gas tanker has different characteristic, both in handling the load and the carriage system. MT. Gas Nuri Arizona is a vessel with Fully Pressurized type which designed to load huge amount of LPG and Liquefied gas. The purpose of this research are, to know the problem caused during loading process and efforts to prevent it. From the research that had been done in sea project on MT. Gas Nuri Arizona about the efforts to prevent delays LPG loading process, problem that occur when the loading process is implementation of procedures that are not good, heat transfer cargo from the ship which gave the charge ( mother ship ) and less optimal cargo compressor performance. Then the effort to overcome it is to carry out loading according to the procedure, requiring the crew to have a basic certificate for liquefied gas tankers, coordinate with duty officers from mother ship, and carry out maintenance tools appropriate loading plan maitenace system. This research use descriptive qualitative method, as well as data collection direct observation by observing the object of research , conducted interviews with a number of respondents and supported by documentation method. From the research above, we can conclude that loading procces of LPG on LPG/C Gas Nuri Arizona can be smoothly if the loading process is carried out according to the procedure, good coordination and communication during the loading process, and the equipment in good condition.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Kata kunci : pencegahan,pemuatan, LPG. Keyword : Prevention, loading, LPG.
Subjects: Skripsi > Nautika
Divisions: Nautika
Depositing User: Unnamed user with email perpustakaan@pip-semarang.ac.id
Date Deposited: 30 Dec 2019 07:30
Last Modified: 30 Dec 2019 07:30
URI: http://repository.pip-semarang.ac.id/id/eprint/2118

Actions (login required)

View Item View Item