MAULINA, KARTIKA (2017) PROSES PEMBONGKARAN MUATAN CURAH BATU BARA PADA MV. ARIMBI BARUNA. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.
|
Text
11.BAB I PENDAHULUAN.pdf Download (3MB) | Preview |
|
|
Text
12. BAB II LANDASAN TEORI.pdf Download (8MB) | Preview |
|
Text
13. BAB III METODE PENELITIAN.pdf Restricted to Registered users only Download (4MB) | Request a copy |
||
Text
14. BAB IV ANALISA HASIL PENELITIAN DAN PEMBAHASAN.pdf Restricted to Registered users only Download (14MB) | Request a copy |
||
|
Text
15. BAB V PENUTUP.pdf Download (1MB) | Preview |
|
|
Text
17. LAMPIRAN.pdf Download (11MB) | Preview |
|
|
Text
18. DAFTAR RIWAYAT HIDUP.pdf Download (916kB) | Preview |
|
|
Text
1. COVER.pdf Download (428kB) | Preview |
|
|
Text
2. HALAMAN PENGESAHAN.pdf Download (1MB) | Preview |
|
|
Text
3. HALAMAN PENGESAHAN.pdf Download (1MB) | Preview |
|
|
Text
16. DAFTAR PUSTAKA.pdf Download (768kB) | Preview |
|
|
Text
5. MOTTO.pdf Download (945kB) | Preview |
|
|
Text
8. DAFTAR ISI.pdf Download (1MB) | Preview |
|
|
Text
9. ABSTRAKSI.pdf Download (1MB) | Preview |
|
|
Text
7. KATA PENGANTAR.pdf Download (1MB) | Preview |
|
|
Text
6. HALAMAN PERSEMBAHAN.pdf Download (1MB) | Preview |
|
|
Text
10. ABSTRACTION.pdf Download (1MB) | Preview |
|
|
Text
4. HALAMAN PERNYATAAN.pdf Download (965kB) | Preview |
Abstract
Maulina Kartika, 2017,NIT : 50134755.N, "The Process Of Discharging Bulk Cargo Coal On MV. Arimbi Baruna", Nautical Thesis, Diploma IV Program, Merchant Marine Polytechnic Semarang, Material Adviser (I): Capt. H.S. Sumardi, SH, MM, M.Mar. as Methodologi and Writing Adviser (II): Sri Suyanti, SS, M.Si The development of sea transportation today was so advanced appropriate era development. In the port activities of PLTU Suralaya discharging coal for production. That need to be attention makes the vessel in state of ready to implement the discharge is implementation of care regularly, of them are care instrument loading and discharging. In its implementation, the discharge of cargo frequently has been delayed. As for the purpose, to reached the research was done by the writer is to find barriers what are often faced by MV. Arimbi Baruna. In fasilitate the process of coal discharging and improve the performance in a progress of discharge and in order to avoid delay. In this thesis rasearch method used is qualitative research methods that regulutes using several aspect such as: data collection through research library, interviews, and doeumentatian. In this case writer conducting observations directly to dock discharging bulk and MV. Arimbi Baruna, writer irnplement intewiews with supevisor that directly touch the process of discharging- A writer also taking picture to support the validity of data in writing the thesis. The research it can be seen factors that causes delay a process of discharging the coal in port of PLTU Suralaya such as, the crane operator land less skilled, lack of treatment in equipment, the labor discharge an old age, and fire cargo incident in the hold due to ventilation system a less well. Based on the research done should port coal of PLTU Suralaya in order to provide education skill far the crane operator and disable labor who is old age replaced by younger and professional power. On discharge equipment held routine maintenance and periodical. During the process loading ongoing and MV. Arimbi Baruna sail to the next port, use the proper hold ventilation. Thus cooperation, there is related parties to minimize constraints on the process discharging the coal, Keyword : Discharge the coal, MV. Arimbi Baruna
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | Skripsi Skripsi > Nautika |
Divisions: | Nautika |
Depositing User: | Mr Agus Wahyudi |
Date Deposited: | 25 Jan 2019 03:05 |
Last Modified: | 04 Feb 2019 08:14 |
URI: | http://repository.pip-semarang.ac.id/id/eprint/154 |
Actions (login required)
View Item |