ANALISIS PENYEBAB CARGO CRANE TIDAK DAPAT MENGANGKAT BEBAN SESUAI DENGAN SAFE WORKING LOAD (SWL) DI KAPAL MV. JUPITER CHARM

KASTRIMAN, KASTRIMAN (2018) ANALISIS PENYEBAB CARGO CRANE TIDAK DAPAT MENGANGKAT BEBAN SESUAI DENGAN SAFE WORKING LOAD (SWL) DI KAPAL MV. JUPITER CHARM. Diploma thesis, POLITEKNIK ILMU PELAYARAN SEMARANG.

[img]
Preview
Text (ABSTRACT)
12. ABSTRACT.pdf

Download (335kB) | Preview
[img]
Preview
Text (BAB II)
BAB 2 FINISH.pdf

Download (873kB) | Preview
[img] Text (BAB III)
BAB3 FINISH.pdf
Restricted to Registered users only

Download (771kB) | Request a copy
[img]
Preview
Text (BAB I)
BAB1 FINISH.pdf

Download (411kB) | Preview
[img]
Preview
Text (ABSTRAK)
11. ABSTRAKSI.pdf

Download (309kB) | Preview
[img] Text (BAB IV)
bab4 final.pdf
Restricted to Registered users only

Download (712kB) | Request a copy
[img]
Preview
Text (BAB V)
bab5 fiish.pdf

Download (193kB) | Preview
[img]
Preview
Text (LAMPIRAN 1-7)
LAMPIRAN SKRIPSI 1-7.pdf

Download (534kB) | Preview
[img]
Preview
Text (DAFTAR RIWAYAT HIDUP)
LL. DAFTAR RIWAYAT HIDUP.pdf

Download (192kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (344kB) | Preview
[img]
Preview
Text (HALAMAN JUDUL)
1. HALAMAN JUDUL..pdf

Download (227kB) | Preview
[img]
Preview
Text (HALAMAN PERSETUJUAN)
2. Halaman Persetujuan.pdf

Download (604kB) | Preview
[img]
Preview
Text (HALAMAN PENGESAHAN)
3. Halaman Pengesahan.pdf

Download (569kB) | Preview
[img]
Preview
Text (HALAMAN PERNYATAAN)
4. Halaman Pernyataan.pdf

Download (543kB) | Preview
[img]
Preview
Text (MOTTO)
5. MOTTO.pdf

Download (179kB) | Preview
[img]
Preview
Text (HALAMAN PERSEMBAHAN)
6. HAL PERSEMBAHAN..pdf

Download (249kB) | Preview
[img]
Preview
Text (KATA PENGANTAR)
7. KATA PENGANTAR..pdf

Download (254kB) | Preview
[img]
Preview
Text (DAFTAR ISI)
8. DAFTAR ISI..pdf

Download (186kB) | Preview
[img]
Preview
Text (DAFTAR TABEL)
9. daftar tabel.pdf

Download (343kB) | Preview
[img]
Preview
Text (DAFTAR GAMBAR)
10. DAFTAR gambar.pdf

Download (355kB) | Preview
Official URL: http://www.library.pip-semarang.ac.id

Abstract

Kastriman, 2018, NIT: 51145478 T, "The cargo crane cause analysis can not lift loads in accordance with safe working load (SWL) on MV vessels. Jupiter Charm ", thesis Teknika Study Program, Diploma IV Program, Polytechnic of Semarang Shipping Sciences, Advisor I: H. Amad Narto, M.Pd., M.Mar. E., Advisor II: Dr. Capt. M. Suwiyadi, M.Pd., M.Mar, Cargo crane is hydraulic pump that serves to drain hydraulic oil and together other components cause hydraulic pressure, electric motor serves as a source of hydraulic pump, hydraulic motor serves as a motor drive luffing, hoisting or slewing on cargo cranes. This cargo crane serves to raise the cargo on board or lower the load from ship to shore, converting electric power into motion power to drive hydraulic pump. Problems arise in cargo cranes where cargo cranes can not lift loads on safe working loads. As a result of the incident the ship should have finished loading the goods within a few days backwards and the company had to pay additional fees for the incident. The impact of the lack of cargo cargo lifting the load on the safe working load has greatly affected the shipping business as it is related to the time and material loss of the shipping company concerned. Given the importance of cargo cranes in order to lift the load according to safe working load then the existence of cargo cranes on the ship must be treated properly. In this case the writer use approach of fishbone method and fault tree analysis, where fishbone method to identify causal factors of cargo crane can not lift load according to safe working load and effort that must be done when the occurrence of the problem is discussed in fault tree analysis. By knowing the causal factors of cargo crane can not lift the load and efforts to overcome the problem is expected handling on cargo crane more directed and down time cargo crane smaller and not disturbing process of loading and unloading and operation of ship itself so that activity of shipping can run smoothly and the company does not experience losses caused by disruption of ship operations, at the end of the author's thesis section presents conclusions and suggestions. Keywords: Cargo crane, safe working load, fish bone and fault tree analysis

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Cargo crane, safe working load, fish bone and fault tree analysis
Subjects: Skripsi > Teknika
Divisions: Teknika
Depositing User: Mr Agus Wahyudi
Date Deposited: 08 Feb 2019 04:35
Last Modified: 08 Feb 2019 04:35
URI: http://repository.pip-semarang.ac.id/id/eprint/1014

Actions (login required)

View Item View Item